Bidder Selection Plan

Nga Bay city resettlement area phase 2

  Watching      
Find: 12:45 07/03/2025
Contractor Selection Plan ID
PL2400276110-01
Publishing time
09:10 07/03/2025
Posting Status
Published
Contractor selection plan name
Nga Bay city resettlement area phase 2
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2400069404-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group B
Project implementation time
4 Years
Authority that issues the decision
UBND tỉnh Hậu Giang
Approval date
05/11/2024
Approval ID
1549/QĐ-UBND
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Highest bid price, Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 20
1.Consulting on topographic surveys, construction drawing designs and construction estimates
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Topographic survey, construction drawing design and construction estimate
Capital source details
Local budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Ngã Bảy Town, Cần Thơ
Implementation location (Before merge)
Hau Giang province
2.Consulting, supervising and surveying the design phase of construction drawings
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervising and surveying the topography of the construction drawing design stage
Capital source details
Local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Ngã Bảy Town, Cần Thơ
Implementation location (Before merge)
Hau Giang province
3.Consultancy and verification of construction drawing design and construction cost estimate
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Verification of construction design and construction estimate
Capital source details
Local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Ngã Bảy Town, Cần Thơ
Implementation location (Before merge)
Hau Giang province
4.Consulting on preparing bidding documents, evaluating bid documents, consulting on topographic surveys, preparing construction drawing designs and construction estimates
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare bidding documents, evaluate bids for topographic survey consulting, prepare construction drawing designs and construction estimates
Capital source details
Local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Ngã Bảy Town, Cần Thơ
Implementation location (Before merge)
Hau Giang province
5.Consulting on preparing bidding documents, evaluating bid documents, consulting on construction supervision and equipment installation supervision
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare bidding documents, evaluate bids, advise on construction supervision and equipment installation supervision
Capital source details
Local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Ngã Bảy Town, Cần Thơ
Implementation location (Before merge)
Hau Giang province
6.Consulting to prepare bidding documents, evaluate bidding documents for construction packages for construction and purchase of materials and equipment (items: Wastewater treatment stations)
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
preparation of bidding documents, evaluation of bids for procurement of materials and equipment
Capital source details
Local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Ngã Bảy Town, Cần Thơ
Implementation location (Before merge)
Hau Giang province
7.Counseling on making bidding documents, evaluating construction bids (items: leveling;
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare bidding documents, evaluate construction bids
Capital source details
Local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Ngã Bảy Town, Cần Thơ
Implementation location (Before merge)
Hau Giang province
8.Construction works (Categories: Leveling; Roads, sidewalks; Trees; Water supply and drainage; Fire protection; Power supply; Public lighting; Parks.
Tender/ Prequalification Notice ID
Contract execution period
365 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of construction items
Capital source details
Local budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2025
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
Ngã Bảy Town, Cần Thơ
Implementation location (Before merge)
Hau Giang province
9.Construction and Equipment supply and installation (Category: Wastewater treatment station)
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Uncategoried
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction and installation of equipment for wastewater treatment plants
Capital source details
Local budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Ngã Bảy Town, Cần Thơ
Implementation location (Before merge)
Hau Giang province
10.Consultancy of construction supervision and equipment installation
Tender/ Prequalification Notice ID
Contract execution period
365 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction supervision and equipment installation
Capital source details
Local budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Quarter I, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Ngã Bảy Town, Cần Thơ
Implementation location (Before merge)
Hau Giang province
11.Consulting on static pile testing (wastewater treatment station)
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Static test of piles (wastewater treatment station)
Capital source details
Local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Ngã Bảy Town, Cần Thơ
Implementation location (Before merge)
Hau Giang province
12.Equipment appraisal consulting
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Equipment cost appraisal
Capital source details
Local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Ngã Bảy Town, Cần Thơ
Implementation location (Before merge)
Hau Giang province
13.Clearing mines and explosives
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Clearing mines and explosives
Capital source details
Local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Ngã Bảy Town, Cần Thơ
Implementation location (Before merge)
Hau Giang province
14.Construction insurance
Tender/ Prequalification Notice ID
Contract execution period
365 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction insurance
Capital source details
Local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Ngã Bảy Town, Cần Thơ
Implementation location (Before merge)
Hau Giang province
15.Independent audit consultant
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction audit
Capital source details
Local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Ngã Bảy Town, Cần Thơ
Implementation location (Before merge)
Hau Giang province
16.Checking the acceptance of construction works
Tender/ Prequalification Notice ID
Contract execution period
365 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Checking the acceptance of construction works
Capital source details
Local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Ngã Bảy Town, Cần Thơ
Implementation location (Before merge)
Hau Giang province
17.Measuring subdivisions and plots, setting up ground plot markers to serve the preparation of documents for issuance of Land Use Rights Certificates
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Measuring subdivisions and plots, setting up ground plot markers to serve the preparation of documents for issuance of Land Use Rights Certificates
Capital source details
Local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Ngã Bảy Town, Cần Thơ
Implementation location (Before merge)
Hau Giang province
18.Measure and prepare documents for land recovery
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Measure and prepare documents for land recovery
Capital source details
Local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Ngã Bảy Town, Cần Thơ
Implementation location (Before merge)
Hau Giang province
19.Prepare a report on the proposal for an environmental permit
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare a report on the proposal for an environmental permit
Capital source details
Local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Ngã Bảy Town, Cần Thơ
Implementation location (Before merge)
Hau Giang province
20.Report on the results of trial operation of the project's waste treatment works
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare a report on test operation results of the project's waste treatment works
Capital source details
Local budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Ngã Bảy Town, Cần Thơ
Implementation location (Before merge)
Hau Giang province

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Nga Bay city resettlement area phase 2". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Nga Bay city resettlement area phase 2" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 41

You did not use the site, Click here to remain logged. Timeout: 60 second