Bidder Selection Plan

OCOP product development point model Lotus products in Thap Muoi district

  Watching      
Find: 12:57 01/08/2024
Contractor Selection Plan ID
PL2400154572-00
Publishing time
10:34 01/08/2024
Posting Status
Published
Contractor selection plan name
OCOP product development point model Lotus products in Thap Muoi district
Investment objective
Gradually complete the infrastructure in the lotus growing material area. Developing lotus plants and lotus products, building added value for lotus products; Linking with tourist attractions, improving infrastructure of community tourism areas, connecting consumer markets; Build a lotus tourism value chain point model.
Project management forms
The investor hires a project management consultant
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2400041103-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group C
Project implementation time
3 Years
Location
Authority that issues the decision
Ủy ban nhân dân huyện Tháp Mười
Approval date
31/07/2024
Approval ID
6570/QĐ-UBND
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 26
1.Tender package No 01: Consulting on topographic survey step 2 (Embankments, bridges and electricity)
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital supports 15 billion VND; Other legally mobilized capital is 5 billion VND and district budget capital corresponds to the remainder
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2024
Type of contract
All in One
Prequalification
No
Location
Tháp Mười District, Đồng Tháp
2.Tender package No 02: Consulting on survey supervision for step 2 (Embankments, bridges and electricity)
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital supports 15 billion VND; Other legally mobilized capital is 5 billion VND and district budget capital corresponds to the remainder
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2024
Type of contract
All in One
Prequalification
No
Location
Tháp Mười District, Đồng Tháp
3.Tender package No 03: Consulting on construction drawing design and estimates (Embankment combined with traffic; Go Thap canal bridge - K27; Medium and low voltage electricity, transformer station)
Tender/ Prequalification Notice ID
Contract execution period
15 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital supports 15 billion VND; Other legally mobilized capital is 5 billion VND and district budget capital corresponds to the remainder
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2024
Type of contract
All in One
Prequalification
No
Location
Tháp Mười District, Đồng Tháp
4.Tender package No 04: Consulting on construction drawing design and estimates (Building a tourist destination model)
Tender/ Prequalification Notice ID
Contract execution period
15 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital supports 15 billion VND; Other legally mobilized capital is 5 billion VND and district budget capital corresponds to the remainder
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2024
Type of contract
All in One
Prequalification
No
Location
Tháp Mười District, Đồng Tháp
5.Tender package No 05: Consulting on construction design verification and estimates (Embankment combined with traffic; Go Thap canal bridge - K27; Medium and low voltage electricity, transformer station)
Tender/ Prequalification Notice ID
Contract execution period
15 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital supports 15 billion VND; Other legally mobilized capital is 5 billion VND and district budget capital corresponds to the remainder
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2024
Type of contract
All in One
Prequalification
No
Location
Tháp Mười District, Đồng Tháp
6.Tender package No 06: Consulting on construction design verification and estimates (Building a tourist destination model)
Tender/ Prequalification Notice ID
Contract execution period
15 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital supports 15 billion VND; Other legally mobilized capital is 5 billion VND and district budget capital corresponds to the remainder
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2024
Type of contract
All in One
Prequalification
No
Location
Tháp Mười District, Đồng Tháp
7.Bidding package No. 07: Consulting on preparation of bidding documents, request documents and evaluation of bidding documents, proposal documents (Embankment combined with traffic)
Tender/ Prequalification Notice ID
Contract execution period
50 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital supports 15 billion VND; Other legally mobilized capital is 5 billion VND and district budget capital corresponds to the remainder
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Location
Tháp Mười District, Đồng Tháp
8.Bidding package No. 08: Consulting on preparation of bidding documents, request documents and evaluation of bidding documents, proposal documents (Go Thap Canal Bridge - K27)
Tender/ Prequalification Notice ID
Contract execution period
50 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital supports 15 billion VND; Other legally mobilized capital is 5 billion VND and district budget capital corresponds to the remainder
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Location
Tháp Mười District, Đồng Tháp
9.Bidding package No. 09: Consulting on preparation of bidding documents, request documents and evaluation of bidding documents, proposal documents (medium and low voltage electricity, transformer stations)
Tender/ Prequalification Notice ID
Contract execution period
50 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital supports 15 billion VND; Other legally mobilized capital is 5 billion VND and district budget capital corresponds to the remainder
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Location
Tháp Mười District, Đồng Tháp
10.Bidding package No. 10: Consulting on preparation of bidding documents, request documents and evaluation of bidding documents, proposal documents (Building a tourist destination model)
Tender/ Prequalification Notice ID
Contract execution period
50 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital supports 15 billion VND; Other legally mobilized capital is 5 billion VND and district budget capital corresponds to the remainder
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Location
Tháp Mười District, Đồng Tháp
11.Bidding package No. 11: Consulting on preparation of bidding documents, request documents and evaluation of bidding documents, proposal documents (Equipment costs)
Tender/ Prequalification Notice ID
Contract execution period
50 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital supports 15 billion VND; Other legally mobilized capital is 5 billion VND and district budget capital corresponds to the remainder
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Location
Tháp Mười District, Đồng Tháp
12.Tender package No 12: Consulting on appraisal of environmental documents, request documents and appraisal of LCNT results (Embankment combined with traffic)
Tender/ Prequalification Notice ID
Contract execution period
50 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital supports 15 billion VND; Other legally mobilized capital is 5 billion VND and district budget capital corresponds to the remainder
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Location
Tháp Mười District, Đồng Tháp
13.Tender package No 13: Consulting on appraisal of environmental documents, request documents and appraisal of LCNT results (Go Thap Canal Bridge - K27)
Tender/ Prequalification Notice ID
Contract execution period
50 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital supports 15 billion VND; Other legally mobilized capital is 5 billion VND and district budget capital corresponds to the remainder
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Location
Tháp Mười District, Đồng Tháp
14.Tender package No 14: Consulting on appraisal of bidding documents, request documents and appraisal of LCNT results (Medium and low voltage electricity, transformer station)
Tender/ Prequalification Notice ID
Contract execution period
50 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital supports 15 billion VND; Other legally mobilized capital is 5 billion VND and district budget capital corresponds to the remainder
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Location
Tháp Mười District, Đồng Tháp
15.Tender package No 15: Consulting on appraisal of bidding documents, request documents and appraisal of LCNT results (Building a tourist destination model)
Tender/ Prequalification Notice ID
Contract execution period
50 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital supports 15 billion VND; Other legally mobilized capital is 5 billion VND and district budget capital corresponds to the remainder
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Location
Tháp Mười District, Đồng Tháp
16.Bidding package No. 16: Consulting on appraisal of bidding documents, request documents and appraisal of LCNT results (Equipment costs)
Tender/ Prequalification Notice ID
Contract execution period
50 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital supports 15 billion VND; Other legally mobilized capital is 5 billion VND and district budget capital corresponds to the remainder
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Location
Tháp Mười District, Đồng Tháp
17.Tender package No 17: Construction supervision (Embankment combined with traffic)
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital supports 15 billion VND; Other legally mobilized capital is 5 billion VND and district budget capital corresponds to the remainder
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Location
Tháp Mười District, Đồng Tháp
18.Tender package No 18: Construction supervision (Go Thap Canal Bridge - K27)
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital supports 15 billion VND; Other legally mobilized capital is 5 billion VND and district budget capital corresponds to the remainder
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Location
Tháp Mười District, Đồng Tháp
19.Tender package No 19: Construction supervision (Medium and low voltage electricity, transformer station)
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital supports 15 billion VND; Other legally mobilized capital is 5 billion VND and district budget capital corresponds to the remainder
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Location
Tháp Mười District, Đồng Tháp
20.Tender package No 20: Construction supervision (Building a tourist destination model)
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital supports 15 billion VND; Other legally mobilized capital is 5 billion VND and district budget capital corresponds to the remainder
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Location
Tháp Mười District, Đồng Tháp
21.Tender package No 21: Equipment monitoring
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital supports 15 billion VND; Other legally mobilized capital is 5 billion VND and district budget capital corresponds to the remainder
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Location
Tháp Mười District, Đồng Tháp
22.Tender package No 22: Foundation and road surface
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital supports 15 billion VND; Other legally mobilized capital is 5 billion VND and district budget capital corresponds to the remainder
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Location
Tháp Mười District, Đồng Tháp
23.Tender package No 23: Go Thap Canal Bridge - K27
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital supports 15 billion VND; Other legally mobilized capital is 5 billion VND and district budget capital corresponds to the remainder
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Location
Tháp Mười District, Đồng Tháp
24.Tender package No 24: Medium and low voltage electrical system and transformer station
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital supports 15 billion VND; Other legally mobilized capital is 5 billion VND and district budget capital corresponds to the remainder
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Location
Tháp Mười District, Đồng Tháp
25.Tender package No 25: Building a tourist destination model
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital supports 15 billion VND; Other legally mobilized capital is 5 billion VND and district budget capital corresponds to the remainder
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Location
Tháp Mười District, Đồng Tháp
26.Bidding package No. 26: Equipment procurement
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Central budget capital supports 15 billion VND; Other legally mobilized capital is 5 billion VND and district budget capital corresponds to the remainder
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Location
Tháp Mười District, Đồng Tháp

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "OCOP product development point model Lotus products in Thap Muoi district". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "OCOP product development point model Lotus products in Thap Muoi district" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 2

Greeting
Greeting,
You are not logged in, please log in to use our various functions for members.

You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!

If you are still not our member, please sign up.

Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.

Search for bid information
Click for advanced search
Statistical
  • 7910 Projects are waiting for contractors
  • 559 Tender notices posted in the last 24 hours
  • 929 Contractor selection plan posted in the last 24 hours
  • 23882 Tender notices posted in the past month
  • 37761 Contractor selection plan posted in the last month
Consultants are supporting you
You are not logged in.
To view information, please Login or Register if you do not have an account.
Signing up is simple and completely free.
You did not use the site, Click here to remain logged. Timeout: 60 second