Bidder Selection Plan

ODN Ninh Hoa optical cable

  Watching      
Find: 11:16 08/04/2025
Contractor Selection Plan ID
PL2500072357-00
Publishing time
11:15 08/04/2025
Posting Status
Published
Contractor selection plan name
ODN Ninh Hoa optical cable
Bid Solicitor
Investor
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500018149-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group C
Project implementation time
45 Date
Authority that issues the decision
Viễn Thông Khánh Hòa
Approval date
03/04/2025
Approval ID
232/QĐ-VTKH-KTĐT
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 3
1.Civil Works
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
New construction of KL fiber optic cable capacity of 12FO = 27.35 km; New construction of Hanging optical cable route capacity 24fo = 0.41 km; New construction of Splitter box type 1: 8 SC/APC (including OTB and Splitter boxes) = 96 sets; Building new Splitter box level 1:16 SC/APC (including OTB and Splitter boxes) = 52 sets; New construction of concrete columns 7met = 18 columns; Newly built Splitter 1: 4 Leaving = 13; OTB OUT 24FO = 01 box;
Capital source details
Depreciation of fixed assets
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Ninh Hòa Town, Khánh Hòa
Implementation location (Before merge)
Khanh Hoa province
2.Shopping OTB and Splitter
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Splitter box type 1: 8 SC/APC (including OTB and Splitter boxes) = 96 sets; Splitter box level 1:16 SC/APC (including OTB and Splitter boxes) = 52 sets; Splitter 1: 4 Leaving = 13; OTB OUT 24FO = 01 box;
Capital source details
Depreciation of fixed assets
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Ninh Hòa Town, Khánh Hòa
Implementation location (Before merge)
Khanh Hoa province
3.Audit
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Auditing the final settlement of investment capital reports
Capital source details
Depreciation of fixed assets
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Nha Trang City, Khánh Hòa
Implementation location (Before merge)
Khanh Hoa province

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "ODN Ninh Hoa optical cable". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "ODN Ninh Hoa optical cable" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 4

You did not use the site, Click here to remain logged. Timeout: 60 second