Package No. 03/TVTK/DTXD 2025- Consulting on preparing FS for 03 projects: Lower pressure of highways 373E1.41 and 374E1.41 Mai Lam, Connecting loop circuit of highway 373E1.41 after lowering pressure with highway 473E1.41 Mai Lam; Improving low voltage highways 381E1.1 Dong Anh, 375E1.41 Mai Lam, transferring power supply to Tuan Le 1 and Tuan Le 3 substations; Improve power supply capacity of Transformer Stations by 2025.
Package No. 03/TVTK/DTXD 2025- Consulting on preparing FS for 03 projects: Lower pressure of highways 373E1.41 and 374E1.41 Mai Lam, Connecting loop circuit of highway 373E1.41 after lowering pressure with highway 473E1.41 Mai Lam; Improving low voltage highways 381E1.1 Dong Anh, 375E1.41 Mai Lam, transferring power supply to Tuan Le 1 and Tuan Le 3 substations; Improve power supply capacity of Transformer Stations by 2025.
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info. Our system will help you download files faster, on any device without installing Client Agent. To download, please Login or Register
6. QĐ phê duyệt KH LCNT (1).pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!! In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 1
1.Tender package No 03/TVTK/DTXD 2025- Consulting on preparing FS for 03 projects: Lower pressure of highways 373E1.41 and 374E1.41 Mai Lam, Connecting loop circuit of highway 373E1.41 after lowering pressure with highway 473E1.41 Mai Lam; Improving low voltage highways 381E1.1 Dong Anh, 375E1.41 Mai Lam, transferring power supply to Tuan Le 1 and Tuan Le 3 substations; Improve power supply capacity of Transformer Stations by 2025
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Package No. 03/TVTK/DTXD 2025- Consulting on preparing FS for 03 projects: Lower pressure of highways 373E1.41 and 374E1.41 Mai Lam, Connecting loop circuit of highway 373E1.41 after lowering pressure with highway 473E1.41 Mai Lam; Improving low voltage highways 381E1.1 Dong Anh, 375E1.41 Mai Lam, transferring power supply to Tuan Le 1 and Tuan Le 3 substations; Improve power supply capacity of Transformer Stations by 2025.". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Package No. 03/TVTK/DTXD 2025- Consulting on preparing FS for 03 projects: Lower pressure of highways 373E1.41 and 374E1.41 Mai Lam, Connecting loop circuit of highway 373E1.41 after lowering pressure with highway 473E1.41 Mai Lam; Improving low voltage highways 381E1.1 Dong Anh, 375E1.41 Mai Lam, transferring power supply to Tuan Le 1 and Tuan Le 3 substations; Improve power supply capacity of Transformer Stations by 2025." plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.