Bidder Selection Plan

Package No. 5: All construction and installation works

  Watching  
Project Contractor selection plan Bid award
Find: 08:38 28/03/2025
Contractor Selection Plan ID
PL2500061950-00
Publishing time
08:37 28/03/2025
Posting Status
Published
Contractor selection plan name
Package No. 5: All construction and installation works
Investment objective
Gradually improve the transportation system, serve the people, create conditions for local socio -economic development.
Project management forms
The investor hires a project management consultant
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500015363-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group C
Project implementation time
1 Years
Authority that issues the decision
UBND PHƯỜNG THUỶ CHÂU
Approval date
26/03/2025
Approval ID
81/QĐ-UBND
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 1
1.Tender package No 5: All construction and installation works
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
a. The Kiet route 36 Pham Huy Thong follows the existing dirt road, the total length of the construction route is about L = 379.62m as follows: - Width of the road: Bn = 0.75+3.5+0.75 = 5.00m. In which: The width of the road surface is = 3.5m; The width of 2x0.75m = 1.5m. (The roadside has a change from the edge of the road to the existing residential area) Sugar surface structure: M300 cement concrete surface 2x4 thick 18cm thick. b. The branch of the branch is 36 Pham Huy Thong, following the existing dirt road, the total length of the construction route is about L = 50.5m as follows: - Width of road background: Bn = 1.0+4.0+1.0 = 6.00m. In which: The width of the road surface is 4.0m; Width of 2x1.0m = 2.0m. - Sugar surface structure: M300 cement concrete surface 2x4 thick 18cm thick - Building a ditch B = 400mm on the right (bottom) of the extent of the branch 36 Pham Huy Thong clinging to the concrete route, discharging into the canal of the current status of the total construction line L = 47.38m; Nail concrete, M200 m200 stone 2x4 stone, covered with m250 stone 1x2.
Capital source details
Ward budget
Contractor Selection Type
Specify reference
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Implementation location
Prequalification
No

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Package No. 5: All construction and installation works". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Package No. 5: All construction and installation works" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 15

You did not use the site, Click here to remain logged. Timeout: 60 second