Bidder Selection Plan

phase 1-2024

  Watching      
Find: 11:28 03/01/2025
Contractor Selection Plan ID
PL2400335560-00
Publishing time
11:27 03/01/2025
Posting Status
Published
Contractor selection plan name
phase 1-2024
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2400080795-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group C
Project implementation time
2 Years
Authority that issues the decision
Hội đồng thành viên Tổng công ty Đầu tư phát triển nhà và đô thị
Approval date
27/12/2024
Approval ID
620/QĐ-HĐTV
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 6
1.TV01-24 MN2
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Set up the task of measuring current elevations and geological surveys to serve construction drawing design and estimates
Capital source details
Investor's own capital, mobilized capital and other legal capital sources
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Thủ Dầu Một City, TP.Hồ Chí Minh
Implementation location (Before merge)
Binh Duong province
2.TV02-24 MN2
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Measuring current elevation and geological survey to serve construction drawing design and estimates
Capital source details
Investor's own capital, mobilized capital and other legal capital sources
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Thủ Dầu Một City, TP.Hồ Chí Minh
Implementation location (Before merge)
Binh Duong province
3.TV03-24 MN2
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Verification of construction drawing design and construction cost estimate
Capital source details
Investor's own capital, mobilized capital and other legal capital sources
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Thủ Dầu Một City, TP.Hồ Chí Minh
Implementation location (Before merge)
Binh Duong province
4.TV04-24 MN2
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare bidding documents and evaluate bids for package TV05-24 MN2
Capital source details
Investor's own capital, mobilized capital and other legal capital sources
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Thủ Dầu Một City, TP.Hồ Chí Minh
Implementation location (Before merge)
Binh Duong province
5.TV05-24 MN2
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Preparation of construction drawings and construction cost estimates
Capital source details
Investor's own capital, mobilized capital and other legal capital sources
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Quarter I, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Thủ Dầu Một City, TP.Hồ Chí Minh
Implementation location (Before merge)
Binh Duong province
6.TV06-24 MN2
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Exploratory test piles
Capital source details
Investor's own capital, mobilized capital and other legal capital sources
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Thủ Dầu Một City, TP.Hồ Chí Minh
Implementation location (Before merge)
Binh Duong province

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "phase 1-2024". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "phase 1-2024" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 11

You did not use the site, Click here to remain logged. Timeout: 60 second