Bidder Selection Plan

phase 1-2025

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 10:54 26/04/2025
Contractor Selection Plan ID
PL2500096423-00
Publishing time
10:49 26/04/2025
Posting Status
Published
Contractor selection plan name
phase 1-2025
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Spending Category
Investment and Development Spending
Authority that issues the decision
TỔNG CÔNG TY ĐẦU TƯ PHÁT TRIỂN NHÀ VÀ ĐÔ THỊ - CÔNG TY TRÁCH NHIỆM HỮU HẠN
Approval date
24/04/2025
Approval ID
2191/QĐ-HUD
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Filter name, Investor, Lowest bid price, Highest bid price, Approval date, Approval ID, Publication date, Bidding package information (View changes)

- Change: Filter name, Publication date (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 6
1.TV01-25 BT-A (18, 19, 20, 21), LK-B (03, 04) set up geological survey tasks
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Making a geological survey task for making feasibility study and construction drawing design
Capital source details
The own capital of the Corporation and other legal mobilized capital sources
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Implementation location
Thủ Dầu Một City, Province Bình Dương
Implementation location (After merge)
Prequalification
No
2.TV02-25 BT-A (18, 19, 20, 21), LK-B (03, 04) Making bidding documents, evaluating bidding documents with TV03-25 BT-A (18, 19, 20, 21), LK-B (03, 04)
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Making bidding documents and evaluating bidding documents with TV03-25 BT-A (18, 19, 20, 21), LK-B (03, 04)
Capital source details
The own capital of the Corporation and other legal mobilized capital sources
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Implementation location
Thủ Dầu Một City, Province Bình Dương
Implementation location (After merge)
Prequalification
No
3.TV03-25 BT-A (18, 19, 20, 21), LK-B (03, 04) Geological survey
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Geological survey serves to prepare feasibility study reports and design construction drawings
Capital source details
The own capital of the Corporation and other legal mobilized capital sources
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Third quarter, 2025
Type of contract
Fixed unit price
Implementation location
Thủ Dầu Một City, Province Bình Dương
Implementation location (After merge)
Prequalification
No
4.TV04-25 BT-A (18, 19, 20, 21), LK-B (03, 04) Making bidding documents, evaluating bidding documents with TV05-25 BT-A (18, 19, 20, 21), LK-B (03, 04)
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Making bidding documents and evaluating bidding documents with TV05-25 BT-A (18, 19, 20, 21), LK-B (03, 04)
Capital source details
The own capital of the Corporation and other legal mobilized capital sources
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Implementation location
Thủ Dầu Một City, Province Bình Dương
Implementation location (After merge)
Prequalification
No
5.TV05-25 BT-A (18, 19, 20, 21), LK-B (03, 04) prepares a construction and construction feasibility study report
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare construction investment feasibility study report
Capital source details
The own capital of the Corporation and other legal mobilized capital sources
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Implementation location
Thủ Dầu Một City, Province Bình Dương
Implementation location (After merge)
Prequalification
No
6.TV06-25 BT-A (18, 19, 20, 21), LK-B (03, 04) verifying the feasibility study report on construction investment
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Verification of construction investment feasibility study report
Capital source details
The own capital of the Corporation and other legal mobilized capital sources
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Implementation location
Thủ Dầu Một City, Province Bình Dương
Implementation location (After merge)
Prequalification
No

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "phase 1-2025". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "phase 1-2025" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 1

You did not use the site, Click here to remain logged. Timeout: 60 second