Phase 3 contractor selection plan for 10 bidding packages for providing technological equipment during the project implementation phase Under project "M2"
Phase 3 contractor selection plan for 10 bidding packages for providing technological equipment during the project implementation phase Under project "M2"
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register
KHLCNT TB VTX.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices! In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 10
1.151-2025-HKVT-DT Providing support equipment and optical cranes for universities
Specialized racks, support carts, operation racks, and optical cranes serve two main purposes including:
- Support the integration implementation process. These types of vehicles and racks require wheels for ease of movement and additional support to stabilize and balance the vehicle when performing integration operations.
- Support the process of lifting/lowering components and structures with large volumes and bulky dimensions using cranes/gantry cranes.
For product lines DH 01, 01M and 02 project targets
Including specialized trailers to support and move materials and finished products between project items. There are 03 different load equivalent types: 500kg, 1500kg and 3000kg.
Included
- Tightening tool set, tightening torque control: Ensures the assembly torque of threaded joint details is in accordance with QTCN as well as ensuring joint quality and product safety.
- Tightening tool adjustment kit: helps to periodically check and control the operating status of torque tightening devices at the desired value, within the allowable range.
Includes standard measuring equipment for product testing according to the requirements of the production technology process as well as testing and controlling static electricity, ensuring conditions for production.
Procurement of 01 system of nitrogen gas generation equipment to ensure the creation and filling of high-pressure nitrogen gas packs to serve inspection and measurement according to the product manufacturing technology process.
Procurement of 04 sets of automatic electrical - electronic testing equipment to serve the inspection and measurement of electrical - electronic parameters of university product lines (01, 01M and 02) arranged in 04 construction items according to the investment goals of the project.
Includes:
09 Spark-free disassembly kits: serving assembly and integration of products to ensure safety without causing sparks and fire and explosion safety at 09 locations and production areas of the project.
17 Standard disassembly tool sets: serving standard assembly and integration work at 17 locations, production and training areas of the project.
Including towing vehicles, forklifts, and people-carrying vehicles serving the work of towing and moving materials, BTP, finished products, and people back and forth between construction items, supporting lifting and lowering materials and people to ensure production, maintenance, and infrastructure maintenance.
Including shared equipment such as tables, anti-static work chairs, shelves, anti-static trays, internal material carts in the workshop, crane cables... to support the production and storage of project materials.
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Phase 3 contractor selection plan for 10 bidding packages for providing technological equipment during the project implementation phase Under project "M2"". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Phase 3 contractor selection plan for 10 bidding packages for providing technological equipment during the project implementation phase Under project "M2"" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.