There has been a decision to approve the investment project
Approval date
20/12/2021
Approval ID
9100/QĐ-EVNHANOI ngày 20/12/2021
Approval Documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register
3.2112_._QD_TBA Phu Cat_G5-16.pdf
List of Bid:
Number of packages: 11
1.Package 5: Surveying consultancy for the preparation of technical and statistical design, preparation of specialized reports, preparation of BIM design in the technical design phase, preparation of the technical design and construction plan, preparation of the technical budget, preparation of the bidding documents.
Open bidding, domestic without pre-qualification, online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2022
Contract Type
All in one
Prequalification
No
Implementation location
Utilities for you:
Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Phu Cat 110kV substation and branch". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Phu Cat 110kV substation and branch" plan as soon as they are posted, sign up for DauThau.info's International VIP 2 plan.