Bidder Selection Plan

plan for selecting a contractor, design options, and cost estimates for relocating infrastructure within the area of land acquired for the project: Dredging and embankment construction, preservation of the Sao Khe River landscape within the Hoa Lu ancient site in Ninh Binh province.

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 21:10 20/08/2026
Contractor Selection Plan ID
PL2600269871-00
Publishing time
21:10 20/08/2026
Posting Status
Published
Contractor selection plan name
plan for selecting a contractor, design options, and cost estimates for relocating infrastructure within the area of land acquired for the project: Dredging and embankment construction, preservation of the Sao Khe River landscape within the Hoa Lu ancient site in Ninh Binh province.
Investment objective
Relocation of infrastructure within the land acquired for the project to dredge and construct a protective embankment, and to preserve the landscape of the Sào Khê River, located within the ancient city of Hoa Lư historical site in Ninh Binh province.
Project management forms
The investor directly manages the project
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2600058360-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Other project
Project implementation time
2 Years
Authority that issues the decision
Ủy ban nhân dân phường Hoa Lư
Approval date
18/08/2026
Approval ID
4317/QĐ-UBND
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 3
1.Procurement Tender package No 03: Consulting Services for Developing a Business Plan and Strategic Development Plan
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Preparation of the bidding document for package 04: Construction and installation of the project
Capital source details
This includes costs related to land acquisition for the dredging and embankment project, as well as landscape preservation efforts along the Sao Khe River within the Hoa Lu ancient site in Ninh Binh province.
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
All in One
Implementation location
Phường Hoa Lư, Province Ninh Bình
Prequalification
No
2.Contract Tender package No 04: Construction and Installation of Buildings
Tender/ Prequalification Notice ID
Contract execution period
420 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction and installation of construction equipment
Capital source details
This includes costs related to land acquisition for the dredging and embankment project, as well as landscape preservation efforts along the Sao Khe River within the Hoa Lu ancient site in Ninh Binh province.
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
Fixed unit price
Implementation location
Phường Hoa Lư, Province Ninh Bình
Prequalification
No
3.Package 05: Construction supervision consultancy
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction supervision consultancy
Capital source details
This includes costs related to land acquisition for the dredging and embankment project, as well as landscape preservation efforts along the Sao Khe River within the Hoa Lu ancient site in Ninh Binh province.
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
All in One
Implementation location
Phường Hoa Lư, Province Ninh Bình
Prequalification
No

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "plan for selecting a contractor, design options, and cost estimates for relocating infrastructure within the area of land acquired for the project: Dredging and embankment construction, preservation of the Sao Khe River landscape within the Hoa Lu ancient site in Ninh Binh province.". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "plan for selecting a contractor, design options, and cost estimates for relocating infrastructure within the area of land acquired for the project: Dredging and embankment construction, preservation of the Sao Khe River landscape within the Hoa Lu ancient site in Ninh Binh province." plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 1

You did not use the site, Click here to remain logged. Timeout: 60 second