Bidder Selection Plan

Plan for selecting additional contractors for the Investment Project to build a different-level intersection between Ring Road 3.5 and Thang Long Avenue, Hoai Duc district

  Watching      
Find: 09:47 07/02/2024
Contractor Selection Plan ID
PL2400018440-00
Publishing time
09:45 07/02/2024
Posting Status
Published
Contractor selection plan name
Plan for selecting additional contractors for the Investment Project to build a different-level intersection between Ring Road 3.5 and Thang Long Avenue, Hoai Duc district
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2300011179-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group A
Project implementation time
5 Years
Authority that issues the decision
UBND Thành phố Hà Nội
Approval date
05/02/2024
Approval ID
771/QĐ-UBND
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 14
1.Tender package No 22: Planning environmental monitoring and environmental monitoring during construction
Tender/ Prequalification Notice ID
Contract execution period
36 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Plan environmental monitoring and environmental monitoring during construction
Capital source details
Hanoi city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hòai Đức District, Hà Nội
Implementation location (Before merge)
Ha Noi city
2.Tender package No 23: Survey and inspection of works adjacent to the project that may be affected during construction
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Survey and inspect works adjacent to the project that may be affected during construction
Capital source details
Hanoi city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hòai Đức District, Hà Nội
Implementation location (Before merge)
Ha Noi city
3.Bidding package No. 24: Prepare bidding documents, evaluate bidding documents for bidding packages No. 26, 28, 30, 31, 32, 33, 35
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare bidding documents and evaluate bids for bidding packages No. 26, 28, 30, 31, 32, 33, 35
Capital source details
Hanoi city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hòai Đức District, Hà Nội
Implementation location (Before merge)
Ha Noi city
4.Bidding package No. 25: Evaluation of bidding documents, contractor selection results for bidding packages No. 26, 28, 30, 31, 32, 33, 35
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Appraisal of bidding documents and contractor selection results for bidding packages No. 26, 28, 30, 31, 32, 33, 35
Capital source details
Hanoi city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hòai Đức District, Hà Nội
Implementation location (Before merge)
Ha Noi city
5.Tender package No 26: Geological survey and construction drawing design step
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Geological survey step of construction drawing design
Capital source details
Hanoi city budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q1 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hòai Đức District, Hà Nội
Implementation location (Before merge)
Ha Noi city
6.Tender package No 27: Supervision of geological survey at construction drawing design step
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervising geological survey design step of construction drawings
Capital source details
Hanoi city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hòai Đức District, Hà Nội
Implementation location (Before merge)
Ha Noi city
7.Tender package No 28: Preparation of construction drawing design (including application of building information modeling (BIM)) and construction of all traffic works, technical infrastructure works and procurement and installation Placing construction equipment (not including moving technical infrastructure projects)
Tender/ Prequalification Notice ID
Contract execution period
36 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Preparation of construction drawing designs (including application of building information modeling (BIM)) and construction of all traffic works, technical infrastructure works and procurement and installation of construction equipment (not including moving technical infrastructure works)
Capital source details
Hanoi city budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q1 2024
Type of contract
According to adjusted unit price
Prequalification
No
Implementation location (After merge)
Hòai Đức District, Hà Nội
Implementation location (Before merge)
Ha Noi city
8.Tender package No 29: Verification of construction drawing design
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Verification of construction drawing design
Capital source details
Hanoi city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hòai Đức District, Hà Nội
Implementation location (Before merge)
Ha Noi city
9.Tender package No 30: Supervision of construction and equipment installation for Packages No. 28, 31
Tender/ Prequalification Notice ID
Contract execution period
36 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervision of construction and equipment installation for packages No. 28, 31
Capital source details
Hanoi city budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q1 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hòai Đức District, Hà Nội
Implementation location (Before merge)
Ha Noi city
10.Tender package No 31: Pile testing
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Piles test
Capital source details
Hanoi city budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q1 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hòai Đức District, Hà Nội
Implementation location (Before merge)
Ha Noi city
11.Bidding package No. 32: Construction insurance (not including technical infrastructure moving part)
Tender/ Prequalification Notice ID
Contract execution period
36 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction insurance (excluding moving technical infrastructure projects)
Capital source details
Hanoi city budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2024
Type of contract
By percentage
Prequalification
No
Implementation location (After merge)
Hòai Đức District, Hà Nội
Implementation location (Before merge)
Ha Noi city
12.Tender package No 33: Quality inspection and load testing of works
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Quality inspection and load testing of projects
Capital source details
Hanoi city budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Second quarter, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hòai Đức District, Hà Nội
Implementation location (Before merge)
Ha Noi city
13.Tender package No 34: Technical verification of traffic safety before putting into use
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Verify traffic safety techniques before putting them into use
Capital source details
Hanoi city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hòai Đức District, Hà Nội
Implementation location (Before merge)
Ha Noi city
14.Bidding package No. 35: Audit of completed project settlement report
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Audit of completed project settlement reports
Capital source details
Hanoi city budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Third quarter, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hòai Đức District, Hà Nội
Implementation location (Before merge)
Ha Noi city

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Plan for selecting additional contractors for the Investment Project to build a different-level intersection between Ring Road 3.5 and Thang Long Avenue, Hoai Duc district". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Plan for selecting additional contractors for the Investment Project to build a different-level intersection between Ring Road 3.5 and Thang Long Avenue, Hoai Duc district" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 852

You did not use the site, Click here to remain logged. Timeout: 60 second