There has been a decision to approve the investment project
Approval date
15/09/2020
Approval ID
2852/QĐ-BQP
Approval Documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register
759-QD-TCT.pdf
Related announcements
- Change:Publication date, Bidding package information (View changes)
Short appointment of contractors, no pre-qualification domestically, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2020
Contract Type
All in one
Prequalification
No
7.Tender package No 08: Consulting and supervision of construction of external electrical network; construction and installation of medium voltage power systems; Digital transformer: 1A, 2, 3A, 4B; Digital transformer: 1B, 3B, 4A, 5A, 5B, 6
Short appointment of contractors, no pre-qualification domestically, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2021
Contract Type
All in one
Prequalification
No
9.Bidding package No. 10: Consulting on setting up bidding documents, evaluating bids for bidding packages: Consulting; Construction of low-rise housing technical infrastructure; Device
Equity, commercial loans and legal mobilized capital
Contractor Selection Type
Do it yourself, domestically, without pre-qualification, not online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2021
Contract Type
According to fixed unit price
Prequalification
No
19.Package 07: Construction supervision consultancy for low-rise housing and technical infrastructure (excluding water supply system, external power network)
Equity, commercial loans and legal mobilized capital
Contractor Selection Type
Open bidding, domestic without pre-qualification, online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2022
Contract Type
All in one
Prequalification
No
Utilities for you:
Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Plan for selecting contractor phase 1". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Plan for selecting contractor phase 1" plan as soon as they are posted, sign up for DauThau.info's International VIP 2 plan.