Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register
QĐ KHLCNT đợt 4.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices! In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 12
1.Bidding package 06: Preparation of Bidding Documents, evaluation of Bidding Documents for project's bidding packages (Except for Regimental Bidding Packages)
6.Tender package No 16: Construction of work items of the Regiment (except for the Regiment Headquarters); Anti-termite; Training area; Sports area; Synchronous road yard; Fence wall; Gate (Reception area); Business tools and equipment (gymnasium, hall, kitchen, RO water purifier, hot shower system) for the entire project
Construction of work items of the Regiment (except the Regiment Headquarters); Anti-termite; Training area; Sports area; Synchronous road yard; Fence wall; Gate (Reception area); Business tools and equipment (gymnasium, hall, kitchen, RO water purifier, hot shower system) for the entire project
9.Tender package No 19: Construction of work items of the affiliated Block, Y24 Military Company, Technical Area (including equipment), Additional Area (including equipment), termite prevention; Side gate, guard post (Technical area, c24); fence (Technical area, c24); Synchronous road yard; Medium voltage line. Transformer station (including equipment); Low voltage lines, outdoor lighting; Water supply and drainage from external network; Clean water system (including equipment), underground water concrete, fire protection water tank; Wastewater treatment system (including equipment)
Construction of work items of the affiliated Block, Y24 Military Company, Technical Area (including equipment), Increase Area (including equipment), termite prevention; Side gate, guard post (Technical area, c24); fence (Technical area, c24); Synchronous road yard; Medium voltage line. Transformer station (including equipment); Low voltage lines, outdoor lighting; Water supply and drainage from external network; Clean water system (including equipment), underground water concrete, fire protection water tank; Wastewater treatment system (including equipment)
10.Tender package No 20: Yard, road (main axis and Regiment boundary); Embankments, retaining walls; Leveling the entire project; Main gate, guard post; Side gate, guard post (remaining); Fence wall (around the land); Garbage collection area; Fire protection system for the entire project (including equipment); External network information system; Landscape trees, stone benches
Yards and roads (main axis and regimental boundary); Embankments, retaining walls; Leveling the entire project; Main gate, guard post; Side gate, guard post (remaining); Fence wall (around the land); Garbage collection area; Fire protection system for the entire project (including equipment); External network information system; Landscape trees, stone benches
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Plan for selecting contractors for phase 4". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Plan for selecting contractors for phase 4" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.