Contractor selection plan name
Plan for selecting contractors for phase 6
Investment objective
- Developing the system of coastal urban areas in the Central region in accordance with the orientation of the overall planning of Vietnam's urban system to 2025 vision to 2050 approved by the Government. - Building Dong Ha city into a green city, responding to climate change in accordance with the city planning goal by 2045, approved by the People's Committee of Quang Tri province in Decision No. 1234/QD-UBND dated June 15, 2023.
Project management forms
Another form
Using ODA capital?
Have
Funding source
ODA capital
Project number
PR2500000203-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group B
Project implementation time
4 Years
Authority that issues the decision
UBND phường Đông Hà
Approval date
05/09/2025
Approval ID
805/QĐ-UBND
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Investor, Decision-making agency, Approval date, Approval ID, Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 24
1.DHGG-LF01 "Construction of embankment works around baldness"
Tender/ Prequalification Notice ID
Contract execution period
27 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of works, transporting equipment and ensuring traffic safety
Capital source details
AFD loan and reciprocal capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
According to adjusted unit price
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quảng Trị
2.DHGG-LF03 "Construction and installation of lake drainage system"
Tender/ Prequalification Notice ID
Contract execution period
24 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of works, transporting equipment and ensuring traffic safety
Capital source details
AFD loan and reciprocal capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
According to adjusted unit price
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quảng Trị
3.DHGG-LF04 "Construction and installation of works to renovate the drainage system downstream Khe May lake"
Tender/ Prequalification Notice ID
Contract execution period
24 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of works, transporting equipment and ensuring traffic safety
Capital source details
AFD loan and reciprocal capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
According to adjusted unit price
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quảng Trị
4.DHGG-LF05 "Construction and installation of southern Hieu river infrastructure"
Tender/ Prequalification Notice ID
Contract execution period
24 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of works, transporting equipment and ensuring traffic safety
Capital source details
AFD loan and reciprocal capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
According to adjusted unit price
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quảng Trị
5.DHGG-CF50 "Consulting on construction supervision and equipment installation"
Tender/ Prequalification Notice ID
Contract execution period
30 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervision of construction and equipment installation of the whole project
Capital source details
Counterpart fund
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quảng Trị
6.DHGG-CF51 "Construction insurance around baldness"
Tender/ Prequalification Notice ID
Contract execution period
27 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Buy insurance for embankments around baldness
Capital source details
Counterpart fund
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
7.DHGG-CF52 "Insurance The project to renovate the drainage system of Ho Chi Minh City"
Tender/ Prequalification Notice ID
Contract execution period
24 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Buy insurance for renovation projects of lake drainage systems
Capital source details
Counterpart fund
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quảng Trị
8.DHGG-CF53 "Insurance The project to renovate the drainage system downstream Khe May Lake"
Tender/ Prequalification Notice ID
Contract execution period
24 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Buy insurance for renovation of the drainage system downstream Khe May Lake
Capital source details
Counterpart fund
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quảng Trị
9.DHGG-CF54 "Insurance works to upgrade the infrastructure of Nam Hieu River"
Tender/ Prequalification Notice ID
Contract execution period
24 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Buy Insurance works to upgrade the southern river infrastructure
Capital source details
Counterpart fund
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quảng Trị
10.DHGG-CF55 "Making Bidding Documents and evaluating Bid Bids Bidding package for construction of embankments around baldness"
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Make Bidding Documents and evaluate Bids for DHGG-LF01 bidding package "Construction and installation of embankments around bald"
Capital source details
Counterpart fund
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quảng Trị
11.DHGG-CF56 "Establishing Bidding Documents and evaluating Bid Bidding package for construction and installation of lake drainage systems"
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Make Bidding Documents and evaluate Bids for DHGG-LF03 bidding package "Construction and installation of lake drainage systems"
Capital source details
Counterpart fund
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quảng Trị
12.DHGG-CF57 "Establishing Bidding Documents and evaluating Bid Bidding package for construction and installation of works to renovate the drainage system downstream Khe May Lake"
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Make Bidding Documents and evaluate Bids for DHGG-LF04 bidding package "Construction and installation of works to renovate the drainage system downstream Khe May Lake"
Capital source details
Counterpart fund
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quảng Trị
13.DHGG-CF58 "Establishing Bidding Documents and evaluating Bid Bidding package for construction and installation of southern Hieu River infrastructure"
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Make Bidding Documents and evaluate Bids for DHGG-LF05 bidding package "Construction and installation of southern Hieu River infrastructure"
Capital source details
Counterpart fund
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quảng Trị
14.DHGG-CF59 "Making Bidding Documents and evaluating Bid Bidding package for construction supervision and construction supervision"
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Make Bidding Documents and evaluate Bids for DHGG-CF50 bidding package "Consulting on construction supervision and equipment installation"
Capital source details
Counterpart fund
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quảng Trị
15.DHGG-CF60 "Making Bidding Documents and evaluating Bid Bids Insurance package of embankments around baldness"
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Make Bidding Documents and evaluate Bid dossier for DHGG-CF51 bidding package "Insurance of embankments around bald"
Capital source details
Counterpart fund
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quảng Trị
16.DHGG-CF61 "Control experiments of embankments around bald"
Tender/ Prequalification Notice ID
Contract execution period
27 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Control experiments of embankments around baldness
Capital source details
Counterpart fund
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quảng Trị
17.DHGG-CF62 "Control experiments of renovation of the lake drainage system"
Tender/ Prequalification Notice ID
Contract execution period
24 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Control experiments for renovation of Ho Chi Minh City Drainage System
Capital source details
Counterpart fund
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quảng Trị
18.DHGG-CF63 "Control experiments on renovation of the drainage system downstream Khe May lake"
Tender/ Prequalification Notice ID
Contract execution period
24 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Control experiments The renovation of the drainage system downstream Khe May Lake
Capital source details
Counterpart fund
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quảng Trị
19.DHGG-CF64 "Control experiments on the southern river infrastructure upgrade"
Tender/ Prequalification Notice ID
Contract execution period
24 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Control experiments of the southern Hieu River infrastructure upgrade
Capital source details
Counterpart fund
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quảng Trị
20.DHGG-CF65 "Monitoring the environment of embankments around baldness"
Tender/ Prequalification Notice ID
Contract execution period
27 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Monitoring the environment of embankments around baldness
Capital source details
Counterpart fund
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quảng Trị
21.DHGG-CF66 "Monitoring the environment of the project to renovate the drainage system of Ho Chi Minh City"
Tender/ Prequalification Notice ID
Contract execution period
24 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Environmental monitoring the project to renovate the drainage system
Capital source details
Counterpart fund
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quảng Trị
22.DHGG-CF67 "Environmental monitoring the project to renovate the drainage system downstream Khe May Lake"
Tender/ Prequalification Notice ID
Contract execution period
24 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Environmental monitoring works to renovate the drainage system downstream Khe May Lake
Capital source details
Counterpart fund
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quảng Trị
23.DHGG-CF68 "Environmental monitoring works to upgrade the infrastructure of Nam Hieu River"
Tender/ Prequalification Notice ID
Contract execution period
24 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Environmental monitoring works to upgrade the infrastructure of the Hieu River
Capital source details
Counterpart fund
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quảng Trị
24.DHGG -CF69 "Environmental monitoring works to renovate low -income zones - traffic items"
Tender/ Prequalification Notice ID
Contract execution period
24 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Environmental monitoring works to renovate low -income zones - traffic items
Capital source details
Counterpart fund
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quảng Trị

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Plan for selecting contractors for phase 6". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Plan for selecting contractors for phase 6" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 5

You did not use the site, Click here to remain logged. Timeout: 60 second