Bidder Selection Plan

Plan for selecting contractors for projects: (1). Overhaul, replace Recloser, Reactive capacitor circuit breakers 376E1.4, 374E1.4, 372E1.39, 373E1.39, 464E1.39, 461E1.39. (2). Overhaul and replace Recloser, Capacitor circuit breaker for routes 460E1.39, 463E1.39, 472E1.32, 480E1.32. (3). Overhauling the low voltage power grid in Thuong Phuc commune in 2026. (4). Overhaul of low voltage columns in Thanh Oai, Binh Minh, Tam Hung, Dan Hoa communes in 2026. (5). Overhauling the low voltage power grid in Thuong Tin commune in 2026. (6). Overhauling the low voltage power grid in Hong Van and Chuong Duong communes in 2026. (7). Overhauling the medium voltage power grid of long-operated branches in the Thuong Tin area. (8). Overhauling the medium voltage power grid of long-operated branches in the Phu Xuyen area

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 17:01 20/07/2026
Contractor Selection Plan ID
PL2600220447-00
Publishing time
16:58 20/07/2026
Posting Status
Published
Contractor selection plan name
Plan for selecting contractors for projects: (1). Overhaul, replace Recloser, Reactive capacitor circuit breakers 376E1.4, 374E1.4, 372E1.39, 373E1.39, 464E1.39, 461E1.39. (2). Overhaul and replace Recloser, Capacitor circuit breaker for routes 460E1.39, 463E1.39, 472E1.32, 480E1.32. (3). Overhauling the low voltage power grid in Thuong Phuc commune in 2026. (4). Overhaul of low voltage columns in Thanh Oai, Binh Minh, Tam Hung, Dan Hoa communes in 2026. (5). Overhauling the low voltage power grid in Thuong Tin commune in 2026. (6). Overhauling the low voltage power grid in Hong Van and Chuong Duong communes in 2026. (7). Overhauling the medium voltage power grid of long-operated branches in the Thuong Tin area. (8). Overhauling the medium voltage power grid of long-operated branches in the Phu Xuyen area
Name of project
(1). Overhaul, replace Recloser, Reactive capacitor circuit breakers 376E1.4, 374E1.4, 372E1.39, 373E1.39, 464E1.39, 461E1.39. (2). Overhaul and replace Recloser, Capacitor circuit breaker for routes 460E1.39, 463E1.39, 472E1.32, 480E1.32. (3). Overhauling the low voltage power grid in Thuong Phuc commune in 2026. (4). Overhaul of low voltage columns in Thanh Oai, Binh Minh, Tam Hung, Dan Hoa communes in 2026. (5). Overhauling the low voltage power grid in Thuong Tin commune in 2026. (6). Overhauling the low voltage power grid in Hong Van and Chuong Duong communes in 2026. (7). Overhauling the medium voltage power grid of long-operated branches in the Thuong Tin area. (8). Overhauling the medium voltage power grid of long-operated branches in the Phu Xuyen area
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Total investment
To view full information, please Login or Register
Spending Category
Other
Authority that issues the decision
Công ty Điện lực Thường Tín
Approval date
17/07/2026
Approval ID
6045/QĐ-PCTHUONGTIN
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 2
1.31-TCCTSCL 2026: Construction of major repair works in 2026
Tender/ Prequalification Notice ID
Contract execution period
75 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Uncategoried
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of 08 major repair projects in 2026
Capital source details
Large repair in 2026
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
Fixed unit price
Implementation location
Prequalification
No
2.32-TN-SCL 2026: Testing major repair works in 2026
Tender/ Prequalification Notice ID
Contract execution period
75 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Testing major repair works in 2026
Capital source details
Large repair in 2026
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
All in One
Implementation location
Prequalification
No

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Plan for selecting contractors for projects: (1). Overhaul, replace Recloser, Reactive capacitor circuit breakers 376E1.4, 374E1.4, 372E1.39, 373E1.39, 464E1.39, 461E1.39. (2). Overhaul and replace Recloser, Capacitor circuit breaker for routes 460E1.39, 463E1.39, 472E1.32, 480E1.32. (3). Overhauling the low voltage power grid in Thuong Phuc commune in 2026. (4). Overhaul of low voltage columns in Thanh Oai, Binh Minh, Tam Hung, Dan Hoa communes in 2026. (5). Overhauling the low voltage power grid in Thuong Tin commune in 2026. (6). Overhauling the low voltage power grid in Hong Van and Chuong Duong communes in 2026. (7). Overhauling the medium voltage power grid of long-operated branches in the Thuong Tin area. (8). Overhauling the medium voltage power grid of long-operated branches in the Phu Xuyen area". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Plan for selecting contractors for projects: (1). Overhaul, replace Recloser, Reactive capacitor circuit breakers 376E1.4, 374E1.4, 372E1.39, 373E1.39, 464E1.39, 461E1.39. (2). Overhaul and replace Recloser, Capacitor circuit breaker for routes 460E1.39, 463E1.39, 472E1.32, 480E1.32. (3). Overhauling the low voltage power grid in Thuong Phuc commune in 2026. (4). Overhaul of low voltage columns in Thanh Oai, Binh Minh, Tam Hung, Dan Hoa communes in 2026. (5). Overhauling the low voltage power grid in Thuong Tin commune in 2026. (6). Overhauling the low voltage power grid in Hong Van and Chuong Duong communes in 2026. (7). Overhauling the medium voltage power grid of long-operated branches in the Thuong Tin area. (8). Overhauling the medium voltage power grid of long-operated branches in the Phu Xuyen area" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 10

You did not use the site, Click here to remain logged. Timeout: 60 second