Bidder Selection Plan

Plan for selecting contractors for the project "Renovating unsafe power grids at intersections in Binh Chanh district" - investment preparation phase

  Watching      
Find: 14:46 07/01/2026
Contractor Selection Plan ID
PL2500256529-01
Publishing time
14:44 07/01/2026
Posting Status
Published
Contractor selection plan name
Plan for selecting contractors for the project "Renovating unsafe power grids at intersections in Binh Chanh district" - investment preparation phase
Project management forms
The investor directly manages the project
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500052887-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group C
Project implementation time
2 Years
Authority that issues the decision
CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - CÔNG TY ĐIỆN LỰC BÌNH CHÁNH
Approval date
07/01/2026
Approval ID
59/QĐ-PCBC
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Approval date, Approval ID, Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 2
1.Consulting on surveying and preparing feasibility report for the project "Renovating unsafe power grids at intersections in Binh Chanh district"
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Pulling a new medium voltage grid 3ACV240+AC95, single line length 79m. - Pulling a new underground medium voltage grid 2x3M240-XLPE-24kV, NR, single line length of 695m. - Pulling new underground medium voltage grid 2x3M240-XLPE-24kV, terrestrial robot, single line length of 1746m.
Capital source details
KHCB + Credit loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
2.Consulting on verifying the feasibility study report, design and construction of the project "Renovating unsafe power grids at intersections in Binh Chanh district"
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on verifying the feasibility study report, design and construction of the project "Renovating unsafe power grids at intersections in Binh Chanh district"
Capital source details
KHCB + Credit loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Plan for selecting contractors for the project "Renovating unsafe power grids at intersections in Binh Chanh district" - investment preparation phase". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Plan for selecting contractors for the project "Renovating unsafe power grids at intersections in Binh Chanh district" - investment preparation phase" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 2

You did not use the site, Click here to remain logged. Timeout: 60 second