Bidder Selection Plan

Plan for selecting contractors (PPC) phase 5 in 2021 of Vinh Tan 4 Thermal Power Plant

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 08:18 23/08/2021
Contractor selection plan ID
20210805609-01
Publication date
08:13 23/08/2021
Publication status
Actual notification
Contractor selection plan name
Plan for selecting contractors (PPC) phase 5 in 2021 of Vinh Tan 4 Thermal Power Plant
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Total investment
To view full information, please Login or Register
Spending Category
Mandatory spending activities
QD status
There has been a decision to approve the investment project
Location
Approval date
27/07/2021
Approval ID
768/QĐ-NĐVT4
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

Related announcements

- Change: Notification form, Publication date (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 14
1.Package 49: Consulting additional planning, surveying and making economic and technical reports for the renovation and repair of temporary ports for construction of Vinh Tan 4 thermal power plant project to export ash and slag
Tender/ Prequalification Notice ID
Contract Period
9 months
Domestic/ International
International
Bidding method
Online
Fields
Advise
Regulatory compliance
Tender value
To view full information, please Login or Register
Funding source
Production and business in 2021
Contractor Selection Type
Bidding widely, domestically, without prequalification, online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
August 2021
Contract Type
All in one
Prequalification
No
Location
2.Tender package No 50: Supply of Electrical Equipment
Tender/ Prequalification Notice ID
Contract Period
12 months
Domestic/ International
International
Bidding method
Online
Fields
Goods
Regulatory compliance
Tender value
To view full information, please Login or Register
Funding source
Production and business in 2021
Contractor Selection Type
Bidding widely, domestically, without prequalification, online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
August 2021
Contract Type
All in one
Prequalification
No
Location
3.Package 51: Supply of safety valve materials
Tender/ Prequalification Notice ID
Contract Period
12 months
Domestic/ International
International
Bidding method
Online
Fields
Goods
Regulatory compliance
Tender value
To view full information, please Login or Register
Funding source
Production and business in 2021
Contractor Selection Type
Bidding widely, domestically, without prequalification, online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
August 2021
Contract Type
All in one
Prequalification
No
Location
4.Tender package No 52: Supply RO . filter core
Tender/ Prequalification Notice ID
Contract Period
12 months
Domestic/ International
International
Bidding method
Online
Fields
Goods
Regulatory compliance
Tender value
To view full information, please Login or Register
Funding source
Construction investment in 2021
Contractor Selection Type
Bidding widely, domestically, without prequalification, online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
August 2021
Contract Type
All in one
Prequalification
No
Location
5.Package 53: Supplying materials for water treatment system
Tender/ Prequalification Notice ID
Contract Period
12 months
Domestic/ International
International
Bidding method
Online
Fields
Goods
Regulatory compliance
Tender value
To view full information, please Login or Register
Funding source
Production and business in 2021
Contractor Selection Type
Bidding widely, domestically, without prequalification, online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
August 2021
Contract Type
All in one
Prequalification
No
Location
6.Package 54: Supply of sensors and CI . equipment
Tender/ Prequalification Notice ID
Contract Period
12 months
Domestic/ International
International
Bidding method
Online
Fields
Goods
Regulatory compliance
Tender value
To view full information, please Login or Register
Funding source
Production and business in 2021
Contractor Selection Type
Bidding widely, domestically, without prequalification, online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
August 2021
Contract Type
All in one
Prequalification
No
Location
7.Package 55: Supply of CSU . equipment
Tender/ Prequalification Notice ID
Contract Period
12 months
Domestic/ International
International
Bidding method
Online
Fields
Goods
Regulatory compliance
Tender value
To view full information, please Login or Register
Funding source
Production and business in 2021
Contractor Selection Type
Bidding widely, domestically, without prequalification, online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
August 2021
Contract Type
All in one
Prequalification
No
Location
8.Tender package No 56: Supply of general materials
Tender/ Prequalification Notice ID
Contract Period
12 months
Domestic/ International
International
Bidding method
Online
Fields
Goods
Regulatory compliance
Tender value
To view full information, please Login or Register
Funding source
Production and business in 2021
Contractor Selection Type
Bidding widely, domestically, without prequalification, online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
August 2021
Contract Type
All in one
Prequalification
No
Location
9.Package 57: Supply of materials for the fuel system
Tender/ Prequalification Notice ID
Contract Period
12 months
Domestic/ International
International
Bidding method
Online
Fields
Goods
Regulatory compliance
Tender value
To view full information, please Login or Register
Funding source
Production and business in 2021
Contractor Selection Type
Bidding widely, domestically, without prequalification, online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
August 2021
Contract Type
All in one
Prequalification
No
Location
10.Package 58: Supply of inserts and rollers of all kinds
Tender/ Prequalification Notice ID
Contract Period
12 months
Domestic/ International
International
Bidding method
Online
Fields
Goods
Regulatory compliance
Tender value
To view full information, please Login or Register
Funding source
Production and business in 2021
Contractor Selection Type
Bidding widely, domestically, without prequalification, online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
August 2021
Contract Type
All in one
Prequalification
No
Location
11.Package 59: Supply of mechanical equipment and materials
Tender/ Prequalification Notice ID
Contract Period
12 months
Domestic/ International
International
Bidding method
Online
Fields
Goods
Regulatory compliance
Tender value
To view full information, please Login or Register
Funding source
Production and business in 2021
Contractor Selection Type
Bidding widely, domestically, without prequalification, online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
August 2021
Contract Type
All in one
Prequalification
No
Location
12.Package 60: Provide Phuoc Thai 1 solar battery washing service in 2021
Tender/ Prequalification Notice ID
Contract Period
12 months
Domestic/ International
International
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Tender value
To view full information, please Login or Register
Funding source
Production and business in 2021
Contractor Selection Type
Offer competitively, domestically, without pre-qualification, online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
August 2021
Contract Type
All in one
Prequalification
No
Location
13.Package 61: Providing services to respond to oil spill incidents at Vinh Tan 4 Thermal Power Plant
Tender/ Prequalification Notice ID
Contract Period
12 months
Domestic/ International
International
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Tender value
To view full information, please Login or Register
Funding source
Production and business in 2021
Contractor Selection Type
Offer competitively, domestically, without pre-qualification, online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
August 2021
Contract Type
All in one
Prequalification
No
Location
14.Package 62: Repair and replace the rotted corrugated iron roof of Vinh Tan 4 . Thermal Power Plant
Tender/ Prequalification Notice ID
Contract Period
6 months
Domestic/ International
International
Bidding method
Online
Fields
Civil Works
Regulatory compliance
Tender value
To view full information, please Login or Register
Funding source
Production and business in 2021
Contractor Selection Type
Bidding widely, domestically, without prequalification, online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
August 2021
Contract Type
All in one
Prequalification
No
Location

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Plan for selecting contractors (PPC) phase 5 in 2021 of Vinh Tan 4 Thermal Power Plant". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Plan for selecting contractors (PPC) phase 5 in 2021 of Vinh Tan 4 Thermal Power Plant" plan as soon as they are posted, sign up for DauThau.info's International VIP 2 plan.
Views: 60

Greeting
Greeting,
You are not logged in, please log in to use our various functions for members.

You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!

If you are still not our member, please sign up.

Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.

Search for bid information
Click for advanced search
Statistical
  • 8549 Projects are waiting for contractors
  • 417 Tender notices posted in the last 24 hours
  • 431 Contractor selection plan posted in the last 24 hours
  • 24859 Tender notices posted in the past month
  • 38646 Contractor selection plan posted in the last month
Consultants are supporting you
You are not logged in.
To view information, please Login or Register if you do not have an account.
Signing up is simple and completely free.
You did not use the site, Click here to remain logged. Timeout: 60 second