Bidder Selection Plan

Plan for selecting contractors to build hamper dams

  Watching  
Project Contractor selection plan Bid award
Find: 09:54 22/04/2025
Contractor Selection Plan ID
PL2500089546-00
Publishing time
09:52 22/04/2025
Posting Status
Published
Contractor selection plan name
Plan for selecting contractors to build hamper dams
Bid Solicitor
Investment objective
Building objectives: Construction of village irrigation dams to ensure stability and supply of self -flowing irrigation water for 10 hectares of rice of Duong Quang commune, Bac Kan city, contributing to hunger eradication, poverty reduction and gradually improving people's lives ...
Project management forms
The investor hires a project management consultant
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500022686-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group C
Project implementation time
1 Years
Authority that issues the decision
UBND xã Dương Quang
Approval date
22/04/2025
Approval ID
62/QĐ-UBND
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 3
1.Project management consultancy
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Project management project
Capital source details
The central budget, local budget and people contribute to implementing the National Program of NTTM
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Implementation location
Bắc Cạn Town, Province Bắc Cạn
Implementation location (After merge)
Prequalification
No
2.Civil Works
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- New investment in hamlet irrigation dams, the length of the dam b = 18m; The width of the dam in the flow is 1.0m; dam height 2.35m; The body is structured by BT 150#; In addition to reinforced concrete 200#, 20cm thick; Stone walls made of VXM 100#; On the body of the dam arranges sand drain with reinforced concrete 200#; The abutments arranged the door to get water into the irrigation canal, with reinforced concrete sheet to regulate. Arranging embankment walls against both sides of the peak of the dam, the wall is deep into the shore to prevent erosion, the structure of XM 100#. - Functional tank: 5.0m long, 18.0m wide, BT M150 structure is 60cm thick, on the surface of BTCT M200 is 15cm thick, arranged drainage holes to reduce pressure with PVC D50 pipe. Stone walls made of VXM M100. - The backyard: 2.0m long, 18.0m wide, the structure of a battle, the size of each basket is (2x1x1) m. - Sewers take water into the irrigation canal: The sewer line is located on the dam of the dam, the length of 9.66m, the structure of concrete M150, the rectangular section of the table = 40x40cm, the layout of the fading slot and the fading sheet of reinforced concrete to regulate the water into the canal, the manhole cover of reinforced M200. - Lower embankment: The length of each side is 6 m, the stone structure is built by VXM M100, the wall of the wall has the layout of drainage holes with VPC D50 tube.
Capital source details
The central budget, local budget and people contribute to implementing the NTT Missal Program.
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Implementation location
Bắc Cạn Town, Province Bắc Cạn
Implementation location (After merge)
Prequalification
No
3.Construction supervision consultancy
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction supervision
Capital source details
The central budget, local budget and people contribute to implementing the NTT Missal Program.
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Implementation location
Bắc Cạn Town, Province Bắc Cạn
Implementation location (After merge)
Prequalification
No

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Plan for selecting contractors to build hamper dams". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Plan for selecting contractors to build hamper dams" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 13

You did not use the site, Click here to remain logged. Timeout: 60 second