Bidder Selection Plan

Plan for selecting sub -complex contractors 2.1 - Investing in public infrastructure adapting to climate change under the project "Development of smart agricultural value chain adaptation of climate change in Tra Vinh province"

    Watching      
Find: 16:33 08/11/2025
Contractor Selection Plan ID
PL2500283019-00
Publishing time
16:32 08/11/2025
Posting Status
Published
Contractor selection plan name
Plan for selecting sub -complex contractors 2.1 - Investing in public infrastructure adapting to climate change under the project "Development of smart agricultural value chain adaptation of climate change in Tra Vinh province"
Investment objective
Developing smart agricultural value chain in Tra Vinh province to support sustainable agricultural development to adapt to climate change in the Mekong Delta in the Resolution No. 120/NQ-CP of the Government
Project management forms
The investor directly manages the project
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2400049350-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group B
Project implementation time
5 Years
Authority that issues the decision
Ban Quản lý Dự án CSAT Trà Vinh
Approval date
05/11/2025
Approval ID
17/QĐ-BQLDA
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 44
1.Bidding Tender package No 79: Consulting on preparation of Bidding Documents, evaluation of Bidding Documents for 02 Supervision bidding packages (Tender Tender package No 83 and Bidding Tender package No 84)
Tender/ Prequalification Notice ID
Contract execution period
55 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on preparing Bidding Documents, evaluating Bidding Documents for 02 Supervision bidding packages (Tender Package No. 83 and Bidding Package No. 84)
Capital source details
Provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
2.Bid package No. 80: Consulting on preparation of Bidding Documents, evaluation of Bidding Documents for 01 Supervision bidding package (Tender Tender package No 85)
Tender/ Prequalification Notice ID
Contract execution period
55 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on preparing Bidding Documents, evaluating Bidding Documents for 01 Supervision bidding package (Tender Package No. 85)
Capital source details
Provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
3.Bidding package No. 81: Consulting on preparation of Bidding Documents, evaluation of Bidding Documents for 01 Supervision bidding package (Tender Tender package No 86)
Tender/ Prequalification Notice ID
Contract execution period
55 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on preparing Bidding Documents, evaluating Bidding Documents for 01 Supervision bidding package (Tender Package No. 86)
Capital source details
Provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
4.Bidding Tender package No 82: Consulting on appraisal of environmental documents, 04 Supervision bidding packages (Tender Packages No. 83, 84, 85, 86)
Tender/ Prequalification Notice ID
Contract execution period
55 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on appraisal of environmental documents, 04 Supervision bidding packages (Tender packages no. 83, 84, 85, 86)
Capital source details
Provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
5.Tender package No 83: Construction supervision consulting for 05 construction packages (from Tender package No 95 to Tender package No 99)
Tender/ Prequalification Notice ID
Contract execution period
270 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on construction supervision of 05 construction bidding packages (from Package No. 95 to Package No. 99)
Capital source details
Provincial budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
6.Tender package No 84: Construction supervision consulting for 05 construction packages (from Tender package No 100 to Tender package No 104)
Tender/ Prequalification Notice ID
Contract execution period
270 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on construction supervision of 05 construction bidding packages (from Package No. 100 to Package No. 104)
Capital source details
Provincial budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
7.Tender package No 85: Construction supervision consulting for 08 construction packages (from Tender package No 112 to Tender package No 119)
Tender/ Prequalification Notice ID
Contract execution period
270 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on construction supervision of 08 construction bidding packages (from Package No. 112 to Package No. 119)
Capital source details
Provincial budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
8.Bid Tender package No 86: Construction Supervision Consulting 09 Construction Bidding Packages (from Bid Tender package No 105 to Bid Tender package No 111 and from Bid Tender package No 120 to Bid Tender package No 121)
Tender/ Prequalification Notice ID
Contract execution period
270 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on construction supervision of 09 construction packages (from Package No. 105 to Package No. 111 and from Package No. 120 to Package No. 121)
Capital source details
Provincial budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
9.Bidding Tender package No 87: Consulting on preparing Bidding Documents, evaluating Bidding Documents for 10 Construction Bidding Packages (from Bidding Tender package No 95 to Bidding Tender package No 104)
Tender/ Prequalification Notice ID
Contract execution period
50 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on preparing Bidding Documents, evaluating Bidding Documents for 10 Construction Bidding Packages (from Bidding Package No. 95 to Bidding Package No. 104)
Capital source details
Provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
10.Bidding Tender package No 88: Consulting on preparation of Bidding Documents, evaluation of Bidding Documents for 05 Construction Bidding Packages (from Bidding Tender package No 112 to Bidding Tender package No 116)
Tender/ Prequalification Notice ID
Contract execution period
50 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on preparing Bidding Documents, evaluating Bidding Documents for 05 Construction Bidding Packages (from Bidding Package No. 112 to Bidding Package No. 116)
Capital source details
05 days
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
11.Bidding Tender package No 89: Consulting on preparation of Bidding Documents, evaluation of Bidding Documents for 11 Construction Bidding Packages (from Bidding Tender package No 105 to Bidding Tender package No 111 and from Bidding Tender package No 117 to Bidding Tender package No 120)
Tender/ Prequalification Notice ID
Contract execution period
50 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on preparing Bidding Documents, evaluating Bidding Documents for 11 Construction Bidding Packages (from Bidding Package No. 105 to Bidding Package No. 111 and from Bidding Package No. 117 to Bidding Package No. 120)
Capital source details
Provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
12.Bidding Tender package No 90: Consulting on preparation of Bidding Documents, evaluation of Bidding Documents 01 Construction Bidding Package (Tender Tender package No 121)
Tender/ Prequalification Notice ID
Contract execution period
50 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on preparing Bidding Documents, evaluating Bidding Documents for 01 Construction Bidding Package (Bidding Package No. 121)
Capital source details
Provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
13.Bidding Tender package No 91: Consulting on appraisal of environmental documents, 10 Construction Bidding Packages (from Bidding Tender package No 95 to Bidding Tender package No 104)
Tender/ Prequalification Notice ID
Contract execution period
50 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on appraisal of Bidding Documents and Result of 10 Construction Bidding Packages (from Bidding Package No. 95 to Bidding Package No. 104)
Capital source details
Provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
14.Bidding Tender package No 92: Consulting on appraisal of environmental documents, 05 Construction Bidding Packages (from Bidding Tender package No 112 to Bidding Tender package No 116)
Tender/ Prequalification Notice ID
Contract execution period
50 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on appraisal of environmental documents, 05 construction bidding packages (from Package No. 112 to Package No. 116)
Capital source details
Provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
15.Bidding Tender package No 93: Consulting on appraisal of environmental documents, 11 Construction Bidding Packages (from Bidding Tender package No 105 to Bidding Tender package No 111 and from Bidding Tender package No 117 to Bidding Tender package No 120)
Tender/ Prequalification Notice ID
Contract execution period
50 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on appraisal of bidding documents, 11 construction bidding packages (from Package No. 105 to Package No. 111 and from Package No. 117 to Package No. 120)
Capital source details
Provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
16.Bid package No. 94: Consulting on appraisal of environmental documents, QLCNT 01 Construction bidding package (Tender package No. 121)
Tender/ Prequalification Notice ID
Contract execution period
50 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on appraisal of environmental documents, 01 construction bidding package (Tender package No. 121)
Capital source details
Provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
17.Tender package No 95: Construction of My Cam project (Cang Long commune)
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of My Cam project (Cang Long commune)
Capital source details
IFAD loan and provincial budget capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
18.Tender package No 96: Construction of Tan An project (Tan An commune)
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of Tan An project (Tan An commune)
Capital source details
IFAD loan and provincial budget capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
19.Tender package No 97: Construction of Dai Phuc project (Binh Phu commune)
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of Dai Phuc project (Binh Phu commune)
Capital source details
IFAD loan and provincial budget capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
20.Tender package No 98: Construction of Binh Phu project (Binh Phu commune)
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of Binh Phu project (Binh Phu commune)
Capital source details
IFAD loan and provincial budget capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
21.Tender package No 99: Construction of 02 projects: Binh Phu and Phuong Thanh (Binh Phu commune)
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of 02 projects Binh Phu and Phuong Thanh (Binh Phu commune)
Capital source details
IFAD loan and provincial budget capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
22.Tender package No 100: Construction of 02 projects Da Loc, Song Loc (Chau Thanh commune, Song Loc commune)
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of 02 projects Da Loc and Song Loc (Chau Thanh commune, Song Loc commune)
Capital source details
IFAD loan and provincial budget capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
23.Tender package No 101: Construction of Phuoc Hao project (Hung My commune)
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of Phuoc Hao project (Hung My commune)
Capital source details
IFAD loan and provincial budget capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
24.Tender package No 102: Construction of 02 projects Hoa Loi and Hung My (Hung My commune)
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of 02 projects Hoa Loi and Hung My (Hung My commune)
Capital source details
IFAD loan and provincial budget capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
25.Tender package No 103: Construction of Long Hoa project (Long Hoa commune)
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of Long Hoa project (Long Hoa commune)
Capital source details
IFAD loan and provincial budget capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
26.Tender package No 104: Construction of Hoa Minh project (Hoa Minh commune)
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of Hoa Minh project (Hoa Minh commune)
Capital source details
IFAD loan and provincial budget capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
27.Tender package No 105: Construction of 02 Kim Son works (Ham Giang commune)
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of 02 Kim Son projects (Ham Giang commune)
Capital source details
IFAD loan and provincial budget capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
28.Tender package No 106: Construction of Chau Dien project (Cau Ke commune)
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of Chau Dien project (Cau Ke commune)
Capital source details
IFAD loan and provincial budget capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
29.Tender package No 107: Construction of Rach Nghe project (Tam Ngai commune)
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of Rach Nghe project (Tam Ngai commune)
Capital source details
IFAD loan and provincial budget capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
30.Tender package No 108: Construction of Ca Lai project (Tam Ngai commune)
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of Ca Lai project (Tam Ngai commune)
Capital source details
IFAD loan and provincial budget capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
31.Tender package No 109: Construction of Tam Ngai project (Tam Ngai commune)
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of Tam Ngai project (Tam Ngai commune)
Capital source details
IFAD loan and provincial budget capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
32.Tender package No 110: Construction of An Phu Tan project (An Phu Tan commune)
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of An Phu Tan project (An Phu Tan commune)
Capital source details
IFAD loan and provincial budget capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
33.Tender package No 111: Construction of Phong Thanh project (Phong Thanh commune)
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of Phong Thanh project (Phong Thanh commune)
Capital source details
IFAD loan and provincial budget capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
34.Tender package No 112: Construction of Hieu Trung project (Tieu Can commune)
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of Hieu Trung project (Tieu Can commune)
Capital source details
IFAD loan and provincial budget capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
35.Tender package No 113: Construction of Tap Ngai project (Tap Ngai commune)
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of Tap Ngai project (Tap Ngai commune)
Capital source details
IFAD loan and provincial budget capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
36.Tender package No 114: Construction of Ngai Hung project (Hung Hoa commune)
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of Ngai Hung project (Hung Hoa commune)
Capital source details
IFAD loan and provincial budget capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
37.Tender package No 115: Construction of Hung Hoa project (Hung Hoa commune)
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of Hung Hoa project (Hung Hoa commune)
Capital source details
IFAD loan and provincial budget capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
38.Tender package No 116: Construction of Tan Hoa project (Tan Hoa commune)
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of Tan Hoa project (Tan Hoa commune)
Capital source details
IFAD loan and provincial budget capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
39.Tender package No 117: Construction of Hiep Hoa project (Nhi Truong commune)
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of Hiep Hoa project (Nhi Truong commune)
Capital source details
IFAD loan and provincial budget capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
40.Tender package No 118: Construction of My Long Nam project (My Long commune)
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of My Long Nam project (My Long commune)
Capital source details
IFAD loan and provincial budget capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
41.Tender package No 119: Construction of 02 works Hiep Thanh and Dan Thanh (Long Huu commune, Duyen Hai ward)
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of 02 projects Hiep Thanh and Dan Thanh (Long Huu commune, Duyen Hai ward)
Capital source details
IFAD loan and provincial budget capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
42.Tender package No 120: Construction of ward 9, Da Loc (Tra Vinh ward, Chau Thanh commune)
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of ward 9, Da Loc (Tra Vinh ward, Chau Thanh commune)
Capital source details
IFAD loan and provincial budget capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
43.Tender package No 121: Construction of 5 electrical projects
Tender/ Prequalification Notice ID
Contract execution period
210 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of 5 power projects
Capital source details
IFAD loan and provincial budget capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
44.Tender package No 122: Construction insurance (only for dike projects)
Tender/ Prequalification Notice ID
Contract execution period
270 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction insurance (only for dike projects)
Capital source details
Provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Plan for selecting sub -complex contractors 2.1 - Investing in public infrastructure adapting to climate change under the project "Development of smart agricultural value chain adaptation of climate change in Tra Vinh province"". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Plan for selecting sub -complex contractors 2.1 - Investing in public infrastructure adapting to climate change under the project "Development of smart agricultural value chain adaptation of climate change in Tra Vinh province"" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 34

You did not use the site, Click here to remain logged. Timeout: 60 second