Plan to repair 0.4kV transmission line after Bai Lim 2 substation (Phuc Son 8) in Phuc Son commune managed by Anh Son Electricity; Repairing 0.4kV power line after Tan Lam 4 and Tan Lam 6 substations (separated from Tan Lam 4 substations) in Quynh Lam commune managed by Quynh Luu Electricity
Plan to repair 0.4kV transmission line after Bai Lim 2 substation (Phuc Son 8) in Phuc Son commune managed by Anh Son Electricity; Repairing 0.4kV power line after Tan Lam 4 and Tan Lam 6 substations (separated from Tan Lam 4 substations) in Quynh Lam commune managed by Quynh Luu Electricity
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info. Our system will help you download files faster, on any device without installing Client Agent. To download, please Login or Register
QD KHLCNT.pdf
List of Bid:
Number of packages: 1
1.Bidding package: Construction of 0.4kV line repair item after Bai Lim 2 substation (Phuc Son 8) in Phuc Son commune managed by Anh Son Electricity; Repairing 0.4kV power line after Tan Lam 4 and Tan Lam 6 substations (separated from Tan Lam 4 substations) in Quynh Lam commune managed by Quynh Luu Electricity
Major repair in 2020 of Northern Power Corporation – Nghe An Power Company
Contractor Selection Type
Bidding widely, domestically, without prequalification, online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2020
Contract Type
All in one
Prequalification
No
Location
Utilities for you:
Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Plan to repair 0.4kV transmission line after Bai Lim 2 substation (Phuc Son 8) in Phuc Son commune managed by Anh Son Electricity; Repairing 0.4kV power line after Tan Lam 4 and Tan Lam 6 substations (separated from Tan Lam 4 substations) in Quynh Lam commune managed by Quynh Luu Electricity". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Plan to repair 0.4kV transmission line after Bai Lim 2 substation (Phuc Son 8) in Phuc Son commune managed by Anh Son Electricity; Repairing 0.4kV power line after Tan Lam 4 and Tan Lam 6 substations (separated from Tan Lam 4 substations) in Quynh Lam commune managed by Quynh Luu Electricity" plan as soon as they are posted, sign up for DauThau.info's International VIP 2 plan.