Plan to select contractors for Resettlement Area No. 1 project to serve clearance of Hoa Lien - Tuy Loan highway construction project on the Eastern North - South Expressway, Da Nang city
Plan to select contractors for Resettlement Area No. 1 project to serve clearance of Hoa Lien - Tuy Loan highway construction project on the Eastern North - South Expressway, Da Nang city
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register
1342 qd.signed.PDF
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices! In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 13
1.Consulting and surveying the design and construction drawing steps
Carrying out the work of preparing design documents for land and soil protection for ground leveling, traffic, rainwater drainage, wastewater drainage, wastewater treatment stations, water supply, fire protection, greenery, road dismantling and relocation. low-voltage wiring and new construction of lighting systems in accordance with current regulations (including setting up survey tasks).
Carry out the verification of the design documents of the physical protection - land leveling items, traffic, rainwater drainage, wastewater drainage, wastewater treatment station, water supply, fire protection, greenery, dismantling and relocation Low voltage lines and new lighting system construction in accordance with current regulations.
8.Consulting on measuring, drawing, and adjusting land plots with cadastral map TL 1/2000 and preparing a form to confirm the results of measuring the current status of the land plot, serving compensation and site clearance.
Carry out measurements and adjustments to the land plot on the cadastral map TL 1/2000 and prepare a confirmation form for the results of measuring the current status of the land plot on the TL 1/200 map, serving compensation and site clearance.
9.Construction and installation of ground leveling, traffic, rainwater drainage, wastewater drainage, wastewater treatment stations, water supply, fire protection, trees, dismantling and relocation of low voltage lines and new construction of the system lighting system
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Plan to select contractors for Resettlement Area No. 1 project to serve clearance of Hoa Lien - Tuy Loan highway construction project on the Eastern North - South Expressway, Da Nang city". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Plan to select contractors for Resettlement Area No. 1 project to serve clearance of Hoa Lien - Tuy Loan highway construction project on the Eastern North - South Expressway, Da Nang city" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.