Plan to select contractors for the project Urgent upgrading and reinforcement of the right bank irrigation system along the Saigon River (from Tra canal to Vam Thuat river) in Hoc Mon district and District 12 - project implementation phase
Plan to select contractors for the project Urgent upgrading and reinforcement of the right bank irrigation system along the Saigon River (from Tra canal to Vam Thuat river) in Hoc Mon district and District 12 - project implementation phase
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info. Our system will help you download files faster, on any device without installing Client Agent. To download, please Login or Register
QD 385 ngày 23.8.2024 duyet KHLCNT.signed.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!! In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 41
1.Package TV-6: Consulting on setting up construction survey tasks and implementing them after basic design
5.Package TV-10: Survey consulting, construction design and implementation after the basic design of the dyke along the Saigon River (from Vam Thuat river to Ba Hong canal); Cau Vong canal sewer; Inland dike routes in District 12; repairing the equipment management house of Ba Thon sewer and Da Han sewer; Automatic monitoring and warning system for floods and high tides
6.Package TV-11: Survey consulting, construction design and implementation after the basic design of the dyke along the Saigon River (from Ba Hong canal to Ba Men bridge); Ba Hong canal sewer; Inland dike routes in Hoc Mon district; monitoring system, automatic flood and storm warning system and central management software
30.Package XL-6: Construction of Ba Hong canal culvert and management house; Build central management software for automatic flood and high tide monitoring and warning systems
31.Package XL-7: Construction of Cau Vong canal culverts and management house; Repairing the equipment management house of Ba Thon sewer and Da Han sewer
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Plan to select contractors for the project Urgent upgrading and reinforcement of the right bank irrigation system along the Saigon River (from Tra canal to Vam Thuat river) in Hoc Mon district and District 12 - project implementation phase". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Plan to select contractors for the project Urgent upgrading and reinforcement of the right bank irrigation system along the Saigon River (from Tra canal to Vam Thuat river) in Hoc Mon district and District 12 - project implementation phase" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.