Planning and Investment Package Supervision of construction and equipment installation of projects 1.Building a loop between Highway 477 and Highway 476-E3.13; Renovating and upgrading the Information Technology branch of road 471-E3.9 roundabout with road 477-E3.1; Building a 22 kV underground cable line from Nam Cuong 4 station to Channel 3 - Highway 474-E3.9 to reduce power loss, improve power supply capacity and power supply grid; 2. To renovate and upgrade Highway 475+ 473 - E3.11 to reduce SWT and improve power supply capacity; 3. To renovate and upgrade trunk roads and branches of 22kV RR 472...(08 projects) )
Planning and Investment Package Supervision of construction and equipment installation of projects 1.Building a loop between Highway 477 and Highway 476-E3.13; Renovating and upgrading the Information Technology branch of road 471-E3.9 roundabout with road 477-E3.1; Building a 22 kV underground cable line from Nam Cuong 4 station to Channel 3 - Highway 474-E3.9 to reduce power loss, improve power supply capacity and power supply grid; 2. To renovate and upgrade Highway 475+ 473 - E3.11 to reduce SWT and improve power supply capacity; 3. To renovate and upgrade trunk roads and branches of 22kV RR 472...(08 projects) )
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info. Our system will help you download files faster, on any device without installing Client Agent. To download, please Login or Register
2672 KHLCNT.pdf
List of Bid:
Number of packages: 1
1.Construction supervision and equipment installation
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Planning and Investment Package Supervision of construction and equipment installation of projects 1.Building a loop between Highway 477 and Highway 476-E3.13; Renovating and upgrading the Information Technology branch of road 471-E3.9 roundabout with road 477-E3.1; Building a 22 kV underground cable line from Nam Cuong 4 station to Channel 3 - Highway 474-E3.9 to reduce power loss, improve power supply capacity and power supply grid; 2. To renovate and upgrade Highway 475+ 473 - E3.11 to reduce SWT and improve power supply capacity; 3. To renovate and upgrade trunk roads and branches of 22kV RR 472...(08 projects) )". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Planning and Investment Package Supervision of construction and equipment installation of projects 1.Building a loop between Highway 477 and Highway 476-E3.13; Renovating and upgrading the Information Technology branch of road 471-E3.9 roundabout with road 477-E3.1; Building a 22 kV underground cable line from Nam Cuong 4 station to Channel 3 - Highway 474-E3.9 to reduce power loss, improve power supply capacity and power supply grid; 2. To renovate and upgrade Highway 475+ 473 - E3.11 to reduce SWT and improve power supply capacity; 3. To renovate and upgrade trunk roads and branches of 22kV RR 472...(08 projects) )" plan as soon as they are posted, sign up for DauThau.info's International VIP 2 plan.