Planning for construction works items (phase 5): Construction of Vinh Lap embankment, section 1, respectively K1+500 – K2+160 dyke of Cane; Construction of Thanh Binh embankment respectively K2+480 – K2+630 and K3+180 – K3+250 right dyke Van Uc; Reinforce the dike surface with concrete at the section from K0+000 – K2+685 (K1+632 – K2+644) to the left of Mia; Reinforcement of dyke surface with concrete from K0+000 – K2+000 right dyke Van Uc
Planning for construction works items (phase 5): Construction of Vinh Lap embankment, section 1, respectively K1+500 – K2+160 dyke of Cane; Construction of Thanh Binh embankment respectively K2+480 – K2+630 and K3+180 – K3+250 right dyke Van Uc; Reinforce the dike surface with concrete at the section from K0+000 – K2+685 (K1+632 – K2+644) to the left of Mia; Reinforcement of dyke surface with concrete from K0+000 – K2+000 right dyke Van Uc
1.Tender package No1: Construction construction of Thanh Binh embankment, section1 respectively from K2+480-K2+630 and section2 respectively from K3+180-K3+250 right dyke of Van Uc river; Construction of Vinh Lap embankment, section 1, respectively from K1+500-K1+700 left dike of Mia river, Thanh Ha district
Bidding widely, domestically, without prequalification, without online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2019
Contract Type
All in one
Prequalification
No
Location
4.Package 4: Construction of reinforcement of the dike surface with concrete from K0+000-K2+685 (K1+632 - K2+644) left dyke of Mia river, Thanh Ha district
Appointment of short-term, domestic contractors, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2019
Contract Type
All in one
Prequalification
No
Location
Utilities for you:
Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Planning for construction works items (phase 5): Construction of Vinh Lap embankment, section 1, respectively K1+500 – K2+160 dyke of Cane; Construction of Thanh Binh embankment respectively K2+480 – K2+630 and K3+180 – K3+250 right dyke Van Uc; Reinforce the dike surface with concrete at the section from K0+000 – K2+685 (K1+632 – K2+644) to the left of Mia; Reinforcement of dyke surface with concrete from K0+000 – K2+000 right dyke Van Uc". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Planning for construction works items (phase 5): Construction of Vinh Lap embankment, section 1, respectively K1+500 – K2+160 dyke of Cane; Construction of Thanh Binh embankment respectively K2+480 – K2+630 and K3+180 – K3+250 right dyke Van Uc; Reinforce the dike surface with concrete at the section from K0+000 – K2+685 (K1+632 – K2+644) to the left of Mia; Reinforcement of dyke surface with concrete from K0+000 – K2+000 right dyke Van Uc" plan as soon as they are posted, sign up for DauThau.info's International VIP 2 plan.