Trung tâm Quản lý Ký túc xá và Khu đô thị ĐHQG-HCM
Approval date
24/11/2025
Approval ID
827/QĐ-KTX&ĐTĐH
Approval Documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register
827.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices! In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 1
1.Procurement of medium voltage cabinets Ring Main Unit (RMU), Load Break Switch (LBS) and load breakers for station T8 KTX area B
Procurement of medium voltage cabinets Ring Main Unit (RMU), Load Break Switch (LBS) and load breakers for station T8 KTX area B
Dismantle old cabinets and install new cabinets
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Procurement and installation of medium voltage Ring Main Unit (RMU), Load Break Switch (LBS) and load breakers for station T8 KTX area B". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Procurement and installation of medium voltage Ring Main Unit (RMU), Load Break Switch (LBS) and load breakers for station T8 KTX area B" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.