Procurement of distributed water support equipment to implement Project 1 under the national target program for socio-economic development of ethnic minority and mountainous areas by 2024 in Ea Sup district
Procurement of distributed water support equipment to implement Project 1 under the national target program for socio-economic development of ethnic minority and mountainous areas by 2024 in Ea Sup district
Procurement of distributed water support equipment to implement Project 1 under the national target program for socio-economic development of ethnic minority and mountainous areas by 2024 in Ea Sup district
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register
Copy of 1872 (2).pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices! In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
lriOn kliai Iliac loOn Buy silol rang loOt bj hO 1r9 nudc pliin Sn lhpc biOn
Dg On I thOc Choong IrInh nu liOn qnOc 010 PhOl IriOn (inh 0 - i h/i
.00g Tablet dOn i/c linda SO and niiOn cone. 2024 IrOn din table hay/n
Three Sup, cu hO:
Ino 304 I 000L table
- Dong jell: 000 LII
- Kida b/n: B/n ding.
- liOn ehànàn Inns b/n table: SUS3O4
+ 03/ thickness of coal b/n: ll4nIni: Dn&ng 1mb b/n, 9400ni: Length of Ihàn b/n.
I5l5inai: out of the roof: co ren ion 11149: DuOng noOn .Oa: colon *27:
Doing gin phaa. role: co ron *27: OrrOng xi cOn: no ron '1.27
Than hOn doc lu/I 10 inC doing do gOn sao, Ian dO eli/c chOn glup
tilag IhOi gun In/i Iho sOn piuànu. ngnai quan darn ban lob niP bath
- KOI inn cbdn desk:
*0u0ii01n1i clan boo 3)0 nm Chic cia cllnn ban 270 ill)
- B/ (lOng 1101 Iran dOi when lb/ng nunh .1.49
* line chop dunn9 1mb: 89mm, Chida coo 93.nnm: ChOl li/a nina
- Use of liquid salt in/a ± 5%
- Salk Dung/IOu/I * 0% ,
- Room cleaning. product
Daily news of Boa DUQC school desk and office will be used to study abroad in China
c/c/i table number of orders to be larger than the number of rays/n lb/day,
NDO cin/i table rOl a nil, chOc cO/n, total 1.0 aba fling checked a, O1P g
hug 11101 11.9 cna san ph/in. dan. baa I(nh niP 1(1051
Qay din/a is ti/U cioiOn OP lila/I: QCVN I 2-3 .2(11 1/BYT. TCVN
5834:1994
- I-Id by qaOn 1/ chain data chain: ISO 9(1(11:21(15)
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Procurement of distributed water support equipment to implement Project 1 under the national target program for socio-economic development of ethnic minority and mountainous areas by 2024 in Ea Sup district". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Procurement of distributed water support equipment to implement Project 1 under the national target program for socio-economic development of ethnic minority and mountainous areas by 2024 in Ea Sup district" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.