Summary of main tasks of the bid package
- Rent a field to open and organize a competition for about 400 people at US Pickleball Stadium 70 An Duong, Tay Ho, Hanoi.
+ 01 stadium to open and livestream score matches from 06:00 to 19:00 on March 28, 2026
+ 17 competition fields from 06:00 to 16:00 on March 28, 2026
+ 12 competition fields from 4:00 p.m. to 7:00 p.m. on March 28, 2026
+ 08 competition fields from 06:00 to 08:00 on March 29, 2026
+ 04 competition fields from 08:00 to 10:00 on March 29, 2026
+ 01 competition field from 06:00 to 12:00 on March 29, 2026 to serve live streaming of final scores
Requirements: The field is eligible for competition according to international standards, meeting the required number
- Organize tournaments with the following contents:
+ Fees for licensing, consulting, organizing and operating the tournament.
+ Food, travel, and salary expenses for the Referee Team and Executive Team for 02 days March 28-29, 2026
+ Security, hygiene, and medical costs for the entire tournament for 2 days March 28-29, 2026
+ Competition balls: 300 Franklin brand balls
+ Drinking water for athletes: 720 bottles of 350ml
+ Fee for bringing water into the yard (if any)
- Logistics for the Tournament:
+ Sound and lighting system for entertainment and tournament management
+ Design and construction of backdrops and standees (Backdrops at the competition field are printed with hiflex canvas stretched on a load-bearing iron frame. Dimensions: 11*2.85m); The backdrop at the Gala was printed with hiflex canvas stretched on a load-bearing iron frame
Size: 7.5*3m; 18 standees printed on hiflex canvas stretched on rolling standees measuring 1.8x0.8m
+ Construction and installation: stage floor, award podium, speech podium
+ Decorative flowers (02 podium flowers; 02 congratulatory flowers; 06 award flowers; 12 delegate table flowers)
+ Tables and chairs for delegates and opening guests (covered with towels) for about 36 people.
+ Guest names and 23 branches. Nameplates of BTC areas
+ Transportation, installation, dismantling, construction costs and other costs serving organizational work