Bidder Selection Plan

Project consultancy planning plan: Electrical technical infrastructure construction works (power grid operator) of Long An Power Company

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 12:40 21/06/2025
Contractor Selection Plan ID
PL2500027492-01
Publishing time
09:14 21/06/2025
Posting Status
Published
Contractor selection plan name
Project consultancy planning plan: Electrical technical infrastructure construction works (power grid operator) of Long An Power Company
Project management forms
The investor directly manages the project
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500006821-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group C
Project implementation time
5 Years
Authority that issues the decision
Công ty Điện lực Long An
Approval date
18/06/2025
Approval ID
1644/QĐ-PCLA
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Approval date, Approval ID, Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 5
1.Package 01: Survey of topographic and geological surveys in service of making feasibility study reports, TKBVTC-DT; Preparation of feasibility study reports, construction drawing design documents - Estimated, bidding documents for construction and procurement of VTTB
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Survey of topographic and geological surveys in service of making feasibility study reports and designing construction drawings - estimates; - Making dossiers of feasibility study reports; - Making dossiers of construction drawing design - Estimated; - Making bidding documents for construction.
Capital source details
Scientific and technical capital of Southern Electricity Corporation and commercial credit capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Tỉnh Long An
2.Package 02: Consulting verification of feasibility study reports, construction drawing designs - Estimated
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Verification of feasibility study reports; - Examination of construction drawing design - Estimation
Capital source details
Scientific and technical capital of Southern Electricity Corporation and commercial credit capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Tỉnh Long An
3.Package 03: Consulting on supervision of construction survey
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervision of construction survey work
Capital source details
Scientific and technical capital of Southern Electricity Corporation and commercial credit capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Tỉnh Long An
4.Package 04: Advice on planning planning projects according to the shortened process
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Make a planning plan according to the shortened process
Capital source details
Scientific and technical capital of Southern Electricity Corporation and commercial credit capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Tỉnh Long An
5.Bidding package 05: Survey consultancy for environmental impact assessment reports
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Survey to make environmental impact assessment reports
Capital source details
Scientific and technical capital of Southern Electricity Corporation and commercial credit capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Tỉnh Long An

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Project consultancy planning plan: Electrical technical infrastructure construction works (power grid operator) of Long An Power Company". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Project consultancy planning plan: Electrical technical infrastructure construction works (power grid operator) of Long An Power Company" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 15

You did not use the site, Click here to remain logged. Timeout: 60 second