- Reduce reactive power for Thanh Mien 110kV substation currently receiving from the Northern power system;
- Improve regional voltage stability, increase line load capacity, and improve power transmission efficiency.
CÔNG TY TNHH MTV ĐIỆN LỰC HẢI DƯƠNG - TỔNG CÔNG TY ĐIỆN LỰC MIỀN BẮC
Approval date
25/10/2024
Approval ID
4376/QĐ-PCHD
Approval Documents
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info. Our system will help you download files faster, on any device without installing Client Agent. To download, please Login or Register
4376. P6.02 QD KHLCNT ( Nguyen).pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!! In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 2
1.Non-consulting bidding package: Construction insurance
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Project: Installing capacitor banks at 110kV busbar 110kV Thanh Mien substation, Hai Duong province in 2025". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Project: Installing capacitor banks at 110kV busbar 110kV Thanh Mien substation, Hai Duong province in 2025" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.