Bidder Selection Plan

Project: Measuring electric field strength, magnetic field of 220kV, 500kV lines and 220kV, 500kV substations of Hanoi Power Center periodically in the first 6 months of 2022

  Watching  
Project Contractor selection plan Bid award
Find: 14:12 18/05/2022
Contractor selection plan ID
20220545109-00
Publication date
14:07 18/05/2022
Publication status
Actual notification
Contractor selection plan name
Project: Measuring electric field strength, magnetic field of 220kV, 500kV lines and 220kV, 500kV substations of Hanoi Power Center periodically in the first 6 months of 2022
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Total investment
To view full information, please Login or Register
Spending Category
Mandatory spending activities
Location
Approval date
11/05/2022
Approval ID
329/QĐ-TTĐHN
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

List of Bid:
Number of packages: 1
1.Tender package: Measuring electric field strength, magnetic field of 220kV, 500kV lines and 220kV, 500kV substations of Hanoi Power Center
Tender/ Prequalification Notice ID
Contract Period
30 days
Domestic/ International
International
Bidding method
Directly
Fields
Advise
Regulatory compliance
Tender value
To view full information, please Login or Register
Funding source
Production cost in 2022
Contractor Selection Type
Short appointment of contractors, no pre-qualification domestically, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
May 2022
Contract Type
All in one
Prequalification
No
Location

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Project: Measuring electric field strength, magnetic field of 220kV, 500kV lines and 220kV, 500kV substations of Hanoi Power Center periodically in the first 6 months of 2022". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Project: Measuring electric field strength, magnetic field of 220kV, 500kV lines and 220kV, 500kV substations of Hanoi Power Center periodically in the first 6 months of 2022" plan as soon as they are posted, sign up for DauThau.info's International VIP 2 plan.
Views: 37

You did not use the site, Click here to remain logged. Timeout: 60 second