Bidder Selection Plan

Project planning: Replacing the air conditioning system and adding a dehumidifier at Dak Pring Hydropower Plant

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 17:21 04/12/2025
Contractor Selection Plan ID
PL2500325928-00
Publishing time
17:10 04/12/2025
Posting Status
Published
Contractor selection plan name
Project planning: Replacing the air conditioning system and adding a dehumidifier at Dak Pring Hydropower Plant
Investment objective
Ensure the safe and reliable operation of equipment in integrated cabinets, electronic equipment, protective relays, information equipment, SCADA, central control computer... in functional equipment rooms at Dak Pring Hydropower Plant
Project management forms
The investor directly manages the project
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500065955-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Other project
Project implementation time
1 Years
Authority that issues the decision
Công ty Dịch vụ Điện lực miền Trung
Approval date
24/11/2025
Approval ID
5992/QĐ-CPSC
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 3
1.Package 01/TVGS: Construction supervision consultancy
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction supervision consultancy
Capital source details
Capital depreciation
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
November 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
2.Package 02/KT: Audit of the project
Tender/ Prequalification Notice ID
Contract execution period
10 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction audit
Capital source details
Capital depreciation
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
November 2025
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
3.Package 01/XL: Supply and installation of air conditioners and dehumidifiers for project: Replacing the air conditioning system and adding dehumidifiers at Dak Pring Hydropower Plant
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supply and installation of air conditioners and dehumidifiers
Capital source details
Basic depreciation + commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
November 2025
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Project planning: Replacing the air conditioning system and adding a dehumidifier at Dak Pring Hydropower Plant". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Project planning: Replacing the air conditioning system and adding a dehumidifier at Dak Pring Hydropower Plant" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 4

You did not use the site, Click here to remain logged. Timeout: 60 second