1.Bid preparation consultancy and Bid analysis and evaluation Consultancy on design and cost estimation Package 01: Survey, TCB from Km0+000 to Km10+000
Appointment of short-term, domestic contractors, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2017
Contract Type
All in one
Prequalification
No
Location
2.Bid preparation consulting and Bid analysis and evaluation Consultancy for design and cost estimation Package 02: Survey, TCB from Km10+000 to Km15+475
Bidding widely, domestically, without prequalification, without online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2017
Contract Type
All in one
Prequalification
No
Location
12.Bidding package: Bid preparation consultancy and Bid analysis and evaluation Consulting construction supervision construction Package 01: from Km0+000 to Km 1+753.21, Kenh Dao bridge
Appointment of short-term, domestic contractors, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2018
Contract Type
All in one
Prequalification
No
Location
13.Bidding package: Bid preparation consultancy and Bid analysis and evaluation Construction supervision consultant Package 02: from Km1+753.21 to Km5+000, Ba Ngan bridge, Mai Dam bridge, Ca Chit bridge, bridge Standing Channel
Appointment of short-term, domestic contractors, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2018
Contract Type
All in one
Prequalification
No
Location
14.Bidding package: Bid preparation consultancy and Bid analysis and evaluation Construction supervision consultant Package 03: from Km5+000 to Km 10+000, Nha Lam bridge, Day Tren bridge, Cay San bridge, Cay bridge Positive.
Appointment of short-term, domestic contractors, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2018
Contract Type
All in one
Prequalification
No
Location
15.Bidding package: Bid preparation consultancy and bid analysis and evaluation Construction supervision consultant Package 04: from Km100,000 to Km 15+475, Nga Tu bridge, Ong Ta bridge, Xeo Muong bridge, Nga bridge Leaves, Bao Bung Bridge, Nga Cai Bridge
Bidding widely, domestically, without prequalification, without online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2018
Contract Type
All in one
Prequalification
No
Location
19.Construction supervision consultant Package 04: from Km10+000 to Km15+475, Nga Tu bridge, Ong Ta bridge, Xeo Muong bridge, Nga La bridge, Bao Bung bridge, Nga Cai bridge
Bidding widely, domestically, without prequalification, without online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2018
Contract Type
All in one
Prequalification
No
Location
20.Bidding package: Bidding consultancy and analysis and evaluation of construction bids and general items Tender package No 01: from Km0+000 to Km1+753.21, Kenh Dao bridge
Appointment of short-term, domestic contractors, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2018
Contract Type
All in one
Prequalification
No
Location
21.Bidding package: Bidding consultancy and analysis and evaluation of construction bids and general items Package 02: from Km1+753.21 to Km3+000, Ba Ngan bridge, Mai Dam bridge
Appointment of short-term, domestic contractors, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2018
Contract Type
All in one
Prequalification
No
Location
22.Bidding package: Bidding consultancy and analysis and evaluation of construction bids and general items Tender package No 03: from Km3+000 to Km5+000, Ca Chili Bridge, Kenh Stand Bridge
Appointment of short-term, domestic contractors, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2018
Contract Type
All in one
Prequalification
No
Location
23.Bidding package: Consulting on preparing bidding documents and analyzing and evaluating construction bids and general items Tender package No 04: from Km5+000 to Km7+600, Nha Lam bridge, Day Tren bridge, Cay San bridge
Appointment of short-term, domestic contractors, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2020
Contract Type
All in one
Prequalification
No
Location
24.Bidding package: Consultancy on preparation of Bid documents and analysis and evaluation of construction bids and general items Tender package No 05: from Km7+600 to Km10+000, Cay Duong bridge
Appointment of short-term, domestic contractors, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2018
Contract Type
All in one
Prequalification
No
Location
25.Bidding package: Consulting on preparing bidding documents and analyzing and evaluating construction bids and general items Package 06: from Km10+000 to Km13+000, Nga Tu bridge, Ong Ta bridge, Xeo Muong bridge
Appointment of short-term, domestic contractors, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2018
Contract Type
All in one
Prequalification
No
Location
26.Bidding package: Bidding consultancy and analysis and evaluation of construction bids and general items Tender package No 07: from Km13+000 to Km15+475, Nga La bridge, Bao Bung bridge, Nga Cai bridge
Bidding widely, domestically, without prequalification, without online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2018
Contract Type
All in one
Prequalification
No
Location
36.Bidding package: Consultancy on preparation of Bid documents and analysis and evaluation of bids for insurance package Package 01: from Km0+000 to Km3+000, Kenh Dao bridge, Ba Ngan bridge, Mai Dam bridge
Appointment of short-term, domestic contractors, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2018
Contract Type
All in one
Prequalification
No
Location
37.Consultancy on preparation of Bid documents and analysis and evaluation of bids for insurance package Package 02: from Km3+000 to Km7+600, Ca Chili Bridge, Kenh Stand Bridge, Nha Lam Bridge, Day Tren Bridge, Cay San Bridge
Appointment of short-term, domestic contractors, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2018
Contract Type
All in one
Prequalification
No
Location
38.Consulting on setting up Bidding Documents and analyzing and evaluating bids for insurance package Package 03: from Km7+600 to Km10+000, Cay Duong bridge and from Km13+000 to Km15+475, Nga La bridge, Bao Bung bridge, Nga bridge Female
Appointment of short-term, domestic contractors, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2018
Contract Type
All in one
Prequalification
No
Location
39.Consultancy on preparation of Bid documents and analysis and evaluation of bidding documents for insurance package Package 04: from Km10+000 to Km13+000, Nga Tu bridge, Ong Ta bridge, Xeo Muong bridge
Bidding widely, domestically, without prequalification, without online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2018
Contract Type
All in one
Prequalification
No
Location
41.Package: Construction Insurance Package 02: from Km3+000 to Km7+600, Ca Chili Bridge, Kenh Stand Bridge, Nha Lam Bridge, Day On Bridge, Cay San Bridge
Bidding widely, domestically, without prequalification, without online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2018
Contract Type
All in one
Prequalification
No
Location
42.Package: Construction insurance Package 03: from Km7+600 to Km10+000, Cay Duong bridge and from Km13+000 to Km15+475, Nga La bridge, Bao Bung bridge, Nga Cai bridge
Bidding widely, domestically, without prequalification, without online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2018
Contract Type
All in one
Prequalification
No
Location
44.Bidding package: Consulting on setting up Bidding documents and analyzing the bidding documents of auditing consultancy Bidding package: Auditing consultancy
Appointment of short-term, domestic contractors, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2020
Contract Type
All in one
Prequalification
No
Location
Utilities for you:
Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Provincial road 927C (section from National Highway 1 to South Hau River).". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Provincial road 927C (section from National Highway 1 to South Hau River)." plan as soon as they are posted, sign up for DauThau.info's International VIP 2 plan.