Bidder Selection Plan

Regarding: approving the Estimate and Contractor Selection Plan for "Loading, transporting, and processing coal at Duc Long warehouse - Pha Lai coal processing and trading station" in 2025

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 17:46 21/11/2024
Contractor Selection Plan ID
PL2400282887-00
Publishing time
17:46 21/11/2024
Posting Status
Published
Contractor selection plan name
Regarding: approving the Estimate and Contractor Selection Plan for "Loading, transporting, and processing coal at Duc Long warehouse - Pha Lai coal processing and trading station" in 2025
Procurement name
"Loading, transporting, and processing coal at Duc Long warehouse - Pha Lai coal processing and trading station" in 2025
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Shopping budget
To view full information, please Login or Register
Spending Category
Mandatory spending
Authority that issues the decision
CÔNG TY KINH DOANH THAN HÀ BẮC. CHI NHÁNH CÔNG TY CỔ PHẦN KINH DOANH THAN MIỀN BẮC - VINACOMIN
Approval date
14/11/2024
Approval ID
383/QĐ-THB
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 1
1.Loading, transporting, and processing coal at Duc Long warehouse - Pha Lai coal processing and trading station
Tender/ Prequalification Notice ID
Contract execution period
12 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Loading coal from water transport vehicles to cars or wharves; Loading coal and non-coal products from cars or wharves to water transport vehicles; Loading coal and non-coal products from coal storage yards onto cars; Gathering and consolidating during the import and export process; Transporting coal from the wharf through the scale to the coal storage yard; Transporting coal and non-coal products from the coal storage yard through the scale to the wharf; Weighing the coal warehousing; Weighing imported coal warehouse; Mixing domestic coal with imported coal (the ratio of imported coal to the mix is ​​about 50-70%) to recover coal dust after mixing to meet quality standards according to TCVN (steps include: loading, unloading, transporting input materials; determining the volume of input coal; mixing through a synchronous mixing system and crushing coal to a particle size of ≤ 15mm; loading and transporting the mixed product to the gathering point; gather and accumulate; Determine the output coal volume); Blend domestic coal with imported coal (the ratio of imported coal to the mix is ​​about 30-50%) to recover coal dust after mixing to meet quality standards according to TCVN (conventional method). Phase includes: loading and unloading, transporting input materials; Determine the volume of input coal; Blended through a synchronous mixing system and crushed coal to a particle size of ≤ 15mm; Loading and transporting mixed products to the gathering point; gather and accumulate; Determine output coal volume); Coal crushing (step includes: Loading and transporting input materials; determining input coal volume; crushing through the crushing system; loading and transporting crushed products gathering point; gathering and consolidating piles; assessing output coal particle size); Drying and grinding peat (steps include: Loading and transporting to the drying area; determining the volume of input coal; spreading , dry peat to standard humidity; excavating, transferring to the grinding area and grinding through the grinding system; loading and transporting the crushed product to the gathering point; determining the output coal volume).
Capital source details
Production and business expenses in 2025
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
November 2024
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
Quế Võ District, Bắc Ninh
Implementation location (Before merge)
Bac Ninh province

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Regarding: approving the Estimate and Contractor Selection Plan for "Loading, transporting, and processing coal at Duc Long warehouse - Pha Lai coal processing and trading station" in 2025". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Regarding: approving the Estimate and Contractor Selection Plan for "Loading, transporting, and processing coal at Duc Long warehouse - Pha Lai coal processing and trading station" in 2025" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 57

You did not use the site, Click here to remain logged. Timeout: 60 second