Bidder Selection Plan

Regular management and maintenance of provincial roads DT.505, DT.512 (section Km0 - Km8+370, Van Thien - Tuong Son branch line), DT.515 (section Km11+800 - Km20+822), DT. 520, Provincial Road 525 (section Km0 - Km6+674, Thang Tho - Tuong Van branch line) (years 2024-2025)

  Watching      
Find: 11:04 19/02/2024
Contractor Selection Plan ID
PL2400019803-00
Publishing time
11:02 19/02/2024
Posting Status
Published
Contractor selection plan name
Regular management and maintenance of provincial roads DT.505, DT.512 (section Km0 - Km8+370, Van Thien - Tuong Son branch line), DT.515 (section Km11+800 - Km20+822), DT. 520, Provincial Road 525 (section Km0 - Km6+674, Thang Tho - Tuong Van branch line) (years 2024-2025)
Investment objective
Manage, maintain, and maintain the exploitation capabilities of the Provincial road DT.505, DT.512 (section Km0 - Km8+370, Van Thien branch - Tuong Son), Provincial road 515 (section Km11+800 - Km20+822), Provincial road 520, Provincial road 525 (section Km0 - Km6+674 Thang Tho - Tuong Van branch line) to ensure traffic safety and security safe and sustainable road traffic infrastructure works according to current regulations
Project management forms
The investor directly manages the project
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2400005867-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Other project
Project implementation time
22 Month
Authority that issues the decision
Sở Giao thông vận tải Thanh Hóa
Approval date
07/02/2024
Approval ID
93/QĐ-SGTVT
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 1
1.Tender package No 20: Regular management and maintenance of provincial roads DT.505, DT.512 (section Km0-Km8+370, Van Thien - Tuong Son branch), Provincial road 515 (section Km11+800-Km20+ 822), Tel.520, Tel. 525 (section Km0-Km6+674 Thang Tho - Tuong Van branch) (years 2024-2025)
Tender/ Prequalification Notice ID
Contract execution period
22 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Management work includes: Road patrol; Vehicle counting and periodic inspection; Update road and bridge data and storm and flood situation; storms and floods; Road safety corridor management and connection; bridge inspection; Check bridges before and after stormy season; Update the technical status of the bridge and manage records on computer... - Maintenance work includes: Plastic lining; patch potholes; roadside canvas; singing the land collapses; mowing the lawn; clear vegetation; dredging longitudinal grooves; clear drains and clear water flow; Adjusting signs, sign posts, marker posts, MLG posts, H posts, Km posts, water mark posts (if any)...; road surface cleaning; Painting signs, signposts (steel material), painting marker posts, H, Km. Painting bridge railings; cleaning bridge decks and drainage pipes; cleaning bridge expansion joints; cleaning bridge abutments; clearing wild plants (2 ends of bridge abutment); cleaning bridge railings (material made of anti-rust plated steel). - Ensuring safety for people and vehicles participating in traffic on the route in accordance with road management and maintenance regulations
Capital source details
Sources of economic non-business spending (transportation expenses) in the provincial budget estimate
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2024
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Thanh Hoa province

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Regular management and maintenance of provincial roads DT.505, DT.512 (section Km0 - Km8+370, Van Thien - Tuong Son branch line), DT.515 (section Km11+800 - Km20+822), DT. 520, Provincial Road 525 (section Km0 - Km6+674, Thang Tho - Tuong Van branch line) (years 2024-2025)". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Regular management and maintenance of provincial roads DT.505, DT.512 (section Km0 - Km8+370, Van Thien - Tuong Son branch line), DT.515 (section Km11+800 - Km20+822), DT. 520, Provincial Road 525 (section Km0 - Km6+674, Thang Tho - Tuong Van branch line) (years 2024-2025)" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 38

You did not use the site, Click here to remain logged. Timeout: 60 second