Relocation of 35kV power line to serve site clearance compensation work of project: Diem Thuy ecological rural residential area, Phu Binh district (phase 1); Moving medium voltage, low voltage power lines, transformer stations to serve site clearance. Project: Ring Road V through Thai Nguyen province (section from Phu Binh district connecting to Bac Giang province)
Relocation of 35kV power line to serve site clearance compensation work of project: Diem Thuy ecological rural residential area, Phu Binh district (phase 1); Moving medium voltage, low voltage power lines, transformer stations to serve site clearance. Project: Ring Road V through Thai Nguyen province (section from Phu Binh district connecting to Bac Giang province)
Relocation of 35kV power line to serve site clearance compensation work of project: Diem Thuy ecological rural residential area, Phu Binh district (phase 1); Moving medium voltage, low voltage power lines, transformer stations to serve site clearance. Project: Ring Road V through Thai Nguyen province (section from Phu Binh district connecting to Bac Giang province)
CÔNG TY ĐIỆN LỰC THÁI NGUYÊN – CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC MIỀN BẮC
Approval date
02/09/2024
Approval ID
2049/QĐ-PCTN
Approval Documents
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info. Our system will help you download files faster, on any device without installing Client Agent. To download, please Login or Register
QĐ KHLCNT Gói 2A, 2B, 3A, 4A.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!! In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 1
1.Package 2b: Construction and supply of materials
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Relocation of 35kV power line to serve site clearance compensation work of project: Diem Thuy ecological rural residential area, Phu Binh district (phase 1); Moving medium voltage, low voltage power lines, transformer stations to serve site clearance. Project: Ring Road V through Thai Nguyen province (section from Phu Binh district connecting to Bac Giang province)". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Relocation of 35kV power line to serve site clearance compensation work of project: Diem Thuy ecological rural residential area, Phu Binh district (phase 1); Moving medium voltage, low voltage power lines, transformer stations to serve site clearance. Project: Ring Road V through Thai Nguyen province (section from Phu Binh district connecting to Bac Giang province)" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.