Bidder Selection Plan

“Repair and anti-corrosion restoration of superstructure metal structure of Rong mine RP-3 platform” (Tender package No. DV-443/26-KT1-VTN) - Implementer: Vu Trung Nam (Ext: 2478).

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 16:07 10/03/2026
Contractor Selection Plan ID
PL2600052399-00
Publishing time
15:58 10/03/2026
Posting Status
Published
Contractor selection plan name
“Repair and anti-corrosion restoration of superstructure metal structure of Rong mine RP-3 platform” (Tender package No. DV-443/26-KT1-VTN) - Implementer: Vu Trung Nam (Ext: 2478).
Procurement name
“Repair and anti-corrosion restoration of superstructure metal structure of Rong mine RP-3 platform” (Tender package No. DV-443/26-KT1-VTN) - Implementer: Vu Trung Nam (Ext: 2478).
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Shopping budget
To view full information, please Login or Register
Spending Category
Mandatory spending
Authority that issues the decision
Liên doanh Việt-Nga Vietsovpetro
Approval date
10/03/2026
Approval ID
1808/26-KHLCNT-PTM/BMĐH
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 1
1.“Repair and anti-corrosion restoration of superstructure metal structure of Rong mine RP-3 platform” (Tender package No. DV-443/26-KT1-VTN) - Implementer: Vu Trung Nam (Ext: 2478).
Tender/ Prequalification Notice ID
Contract execution period
487 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Is different
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Includes 3 main parts: (1) “Repair of metal structures on RP-3 platform”; (2) “Restore anti-corrosion paint on RP-3” (3) “Local anti-corrosion maintenance of equipment, pipes, and metal structures according to the instructions of the Truss”
Capital source details
Section 03.05.01.01.01 - Appendix 22.2 LDVN Vietsovpetro financial plan for 2026
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
March, 2026
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "“Repair and anti-corrosion restoration of superstructure metal structure of Rong mine RP-3 platform” (Tender package No. DV-443/26-KT1-VTN) - Implementer: Vu Trung Nam (Ext: 2478).". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "“Repair and anti-corrosion restoration of superstructure metal structure of Rong mine RP-3 platform” (Tender package No. DV-443/26-KT1-VTN) - Implementer: Vu Trung Nam (Ext: 2478)." plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 1

You did not use the site, Click here to remain logged. Timeout: 60 second