Summary of main tasks of the bid package
Shave the lime, old paint on the surface - walls, pillars, columns. Shave the lime, old paint on the surface - soap, ceiling. Bad with baits on the outer wall. Bad with baits into columns, beams, ceilings. Paint beams, ceilings, walls outside the house have been painted by paints of 1 water lining + 2 water covered. Demolition of structures on the roof with cement on the roof. Lang floor, non -colored floor, 3cm thick, XM M100 mortar, PCB40.The solution of roof waterproofing solution, slave, umbrella. Cutting and installing glass - 5mm thick white glass thickness. Shave the lime, old paint on the surface - metal. Iron and steel paint with paints of 1 type of water lined + 2 water covered. Demolition of stone brick structure by 1.5kW concrete drilling machine. Building a straight wall with baked clay bricks 4x8x18cm - thickness ≤10cm, height ≤6m, mortar Xm M75, PCB40. Till tiles, XM M75, PCB40. Installation of PVC mouth pipes, connected by P/P glue, 6m long tube section - 90mm diameter. Demolition of the current status quo base floor. Flooring, floor - Ceramic brick cross section 600x600mm, XM M75 mortar, PCB40. Remove the ceiling. Construction of ceiling with plastic sheet 600x600 skeleton. Remove the roof of the bamboo shoots height ≤4m. Roofing roofing with thick colored square waves 4.2dem