Bidder Selection Plan

Repairing and replacing blocks, drainage panels, paving sidewalks, adding trees to DT04 route (Bach Dang, An Ninh, Huu Nghi, Pham Su Manh, Hoa Binh, Hai Dong streets)

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 21:48 18/09/2024
Contractor Selection Plan ID
PL2400203559-00
Publishing time
21:47 18/09/2024
Posting Status
Published
Contractor selection plan name
Repairing and replacing blocks, drainage panels, paving sidewalks, adding trees to DT04 route (Bach Dang, An Ninh, Huu Nghi, Pham Su Manh, Hoa Binh, Hai Dong streets)
Procurement name
Repairing and replacing blocks, drainage panels, paving sidewalks, adding trees to DT04 route (Bach Dang, An Ninh, Huu Nghi, Pham Su Manh, Hoa Binh, Hai Dong streets)
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Shopping budget
To view full information, please Login or Register
Spending Category
Mandatory spending
Location
Authority that issues the decision
Phòng Quản lý đô thị thị xã Kinh Môn
Approval date
16/09/2024
Approval ID
101/QĐ-QLĐT
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 4
1.Bidding package No. 01: Consulting on preparation of Bidding Documents, evaluation of Bidding Documents for the Topographic Survey package, preparation of Technical Audit Report
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Funding sources are not regularly assigned to the Department of Management and Training
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
September 2024
Type of contract
All in One
Prequalification
No
Location
Kinh Môn District, Hải Dương
2.Bidding package No. 02: Consulting on appraisal of environmental documents, LCNT results of Topographic Survey bidding package, preparation of Technical Audit Report
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Funding sources are not regularly assigned to the Department of Management and Training
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
September 2024
Type of contract
All in One
Prequalification
No
Location
Kinh Môn District, Hải Dương
3.Tender package No 03: Topographic survey, preparation of technical and economic report
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Funding sources are not regularly assigned to the Department of Management and Training
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
September 2024
Type of contract
All in One
Prequalification
No
Location
Kinh Môn District, Hải Dương
4.Tender package No 04: Consultancy for verification of design and cost estimate
Tender/ Prequalification Notice ID
Contract execution period
10 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Funding sources are not regularly assigned to the Department of Management and Training
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
September 2024
Type of contract
All in One
Prequalification
No
Location
Kinh Môn District, Hải Dương

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Repairing and replacing blocks, drainage panels, paving sidewalks, adding trees to DT04 route (Bach Dang, An Ninh, Huu Nghi, Pham Su Manh, Hoa Binh, Hai Dong streets)". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Repairing and replacing blocks, drainage panels, paving sidewalks, adding trees to DT04 route (Bach Dang, An Ninh, Huu Nghi, Pham Su Manh, Hoa Binh, Hai Dong streets)" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 2

Greeting
Greeting,
You are not logged in, please log in to use our various functions for members.

You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!

If you are still not our member, please sign up.

Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.

Search for bid information
Click for advanced search
Statistical
  • 8390 Projects are waiting for contractors
  • 164 Tender notices posted in the last 24 hours
  • 182 Contractor selection plan posted in the last 24 hours
  • 23694 Tender notices posted in the past month
  • 37161 Contractor selection plan posted in the last month
Consultants are supporting you
You are not logged in.
To view information, please Login or Register if you do not have an account.
Signing up is simple and completely free.
You did not use the site, Click here to remain logged. Timeout: 60 second