Bidder Selection Plan

Repairing damage to the road surface, completing the traffic safety system according to QCVN 41: 2024 sections: Km10+200 to Km12+000; Km14+000 to km16+000 Highway 51.

  Watching  
Project Contractor selection plan Bid award
Find: 08:05 23/10/2025
Contractor Selection Plan ID
PL2500233299-01
Publishing time
08:02 23/10/2025
Posting Status
Published
Contractor selection plan name
Repairing damage to the road surface, completing the traffic safety system according to QCVN 41: 2024 sections: Km10+200 to Km12+000; Km14+000 to km16+000 Highway 51.
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500062300-00
Spending Category
Investment and Development Spending
Authority that issues the decision
Trung tâm Quy hoạch, kiểm định xây dựng và bảo trì đường bộ
Approval date
22/10/2025
Approval ID
119/QĐ-TTQHKĐXD&BTĐB
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Lowest bid price, Approval date, Approval ID, Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 3
1.Tender package No 01 (Consulting): Terrain survey
Tender/ Prequalification Notice ID
Contract execution period
15 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Topographic survey
Capital source details
The province's transportation source and the central budget capital allocated to the locality for transition projects
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
2.Tender package No 02 (Consulting): Making technical economic reports
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare economic and technical reports
Capital source details
The province's transportation source and the central budget capital allocated to the locality for transition projects
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
3.Bidding package No. 3 (consulting): Verification of design and estimates
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Verification of designs and estimates
Capital source details
The provincial traffic source and the central budget capital allocated to the locality for transition projects
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Repairing damage to the road surface, completing the traffic safety system according to QCVN 41: 2024 sections: Km10+200 to Km12+000; Km14+000 to km16+000 Highway 51.". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Repairing damage to the road surface, completing the traffic safety system according to QCVN 41: 2024 sections: Km10+200 to Km12+000; Km14+000 to km16+000 Highway 51." plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 5

You did not use the site, Click here to remain logged. Timeout: 60 second