Bidder Selection Plan

Repairing s

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 10:50 29/05/2025
Contractor Selection Plan ID
PL2500132687-00
Publishing time
10:49 29/05/2025
Posting Status
Published
Contractor selection plan name
Repairing s
Procurement name
Metal structure repair, replacement of roofing sheets, roofs; Repairing the structure of the operating floor frame, railing, stairs and steam pipes to melt sulfur - Acid factory; Repair sulfuric acid tank No. 2 - Supe 1 Enterprise
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Shopping budget
To view full information, please Login or Register
Spending Category
Mandatory spending
Authority that issues the decision
Tổng Giám đốc Công ty
Approval date
29/05/2025
Approval ID
606/QĐ-SPLT
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 1
1.Repairing s
Tender/ Prequalification Notice ID
Contract execution period
75 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Bidding package includes 03 categories HM: Repairing metal structure, replacing roofing sheets, roofs - sulfur warehouse: + Removing frame structures, beams, fibro cement roofing sheets, broken and broken; + Manufacturing and installation replacement by new structure according to the approved construction drawing. + Rust and paint the structure according to the listed volume. + Supply and install new cement fibro roofing sheets. + Hygiene returns construction ground. HM: Repairing the structure of the manipulation floor, railing, stairs and steam pipes of the sulfur melting box - Acid factory: + Manufacturing, installing and insulating steam pipes for sulfur liquefied container system. + Insurance sulfur liquefied container. + Manufacturing and reinforcing the manipulation floor structure, stairs, railing according to the approved design drawings. + Construction and installation of cable trays. + Processing electric beams. + Manufacturing sulfur steam pipes according to the approved construction drawing. + Structural paint. + Hygiene returns construction ground. HM: Repair sulfuric acid container No. 2 - SUPE1 Enterprise: + Removing structures, beams, operating floors, stairs, pipes at the old container (supplies for reuse). + Manufacturing, installing new structure and containers according to the approved design drawings. + Hygiene reinstalling old structures and pipes + Hygiene returns construction ground.
Capital source details
Investor's equity
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
May, 2025
Type of contract
All in One
Implementation location
Lâm Thao District, Province Phú Thọ
Implementation location (After merge)
Prequalification
No

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Repairing s". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Repairing s" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 14

You did not use the site, Click here to remain logged. Timeout: 60 second