Bidder Selection Plan

Replacing locally damaged sidewalk tiles in some locations on DT.771 (Road 319) from about Km2+000 to Km7+100

  Watching      
Find: 18:31 13/12/2023
Contractor Selection Plan ID
PL2300253226-01
Publishing time
18:31 13/12/2023
Posting Status
Published
Contractor selection plan name
Replacing locally damaged sidewalk tiles in some locations on DT.771 (Road 319) from about Km2+000 to Km7+100
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2300063540-00
Spending Category
Investment and Development Spending
Location
Authority that issues the decision
CHỦ TỊCH UỶ BAN NHÂN DÂN TỈNH ĐỒNG NAI
Approval date
13/12/2023
Approval ID
3262/QĐ-UBND
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 6
1.Tender package No 01 (construction): Replacing locally damaged sidewalk tiles at some locations on route DT.771 (Road 319) from about Km2+000 to Km7+100 (Including safety costs traffic)
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Provincial budget (source of traffic cause)
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2023
Type of contract
All in One
Prequalification
No
Location
Nhơn Trạch District, Đồng Nai
2.Package 02 (consultation): Prepare bidding documents (E-HSMT) and evaluate bid documents (E-HSDT) package No. 01
Tender/ Prequalification Notice ID
Contract execution period
35 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Provincial budget (source of traffic cause)
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2023
Type of contract
All in One
Prequalification
No
Location
Nhơn Trạch District, Đồng Nai
3.Bidding package No. 03 (consulting): Evaluation of bidding documents (E-HSMT) and contractor selection results for bidding package No. 01.
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Provincial budget (source of traffic cause)
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2023
Type of contract
All in One
Prequalification
No
Location
Nhơn Trạch District, Đồng Nai
4.Bidding package No. 04 (non-consulting): Risk insurance for the investor during the construction of bidding package No. 01.
Tender/ Prequalification Notice ID
Contract execution period
455 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Provincial budget (source of traffic cause)
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2023
Type of contract
All in One
Prequalification
No
Location
Nhơn Trạch District, Đồng Nai
5.Tender package No 05 (consulting): Construction supervision of package No. 01.
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Provincial budget (source of traffic cause)
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2023
Type of contract
All in One
Prequalification
No
Location
Nhơn Trạch District, Đồng Nai
6.Package 06 (consultation): Checking the acceptance work
Tender/ Prequalification Notice ID
Contract execution period
15 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Provincial budget (source of traffic cause)
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2023
Type of contract
All in One
Prequalification
No
Location
Nhơn Trạch District, Đồng Nai

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Replacing locally damaged sidewalk tiles in some locations on DT.771 (Road 319) from about Km2+000 to Km7+100". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Replacing locally damaged sidewalk tiles in some locations on DT.771 (Road 319) from about Km2+000 to Km7+100" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 5

Greeting
Greeting,
You are not logged in, please log in to use our various functions for members.

You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!

If you are still not our member, please sign up.

Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.

Search for bid information
Click for advanced search
Statistical
  • 8488 Projects are waiting for contractors
  • 232 Tender notices posted in the last 24 hours
  • 216 Contractor selection plan posted in the last 24 hours
  • 24193 Tender notices posted in the past month
  • 37689 Contractor selection plan posted in the last month
Consultants are supporting you
You are not logged in.
To view information, please Login or Register if you do not have an account.
Signing up is simple and completely free.
You did not use the site, Click here to remain logged. Timeout: 60 second