Bidder Selection Plan

Selecting insurance contractors during the construction of projects: Replacement of governor and excitation systems at A Roang Hydropower Plant; Replacing the speed regulation system and self-powered AC and DC electrical systems at Dray H'Linh B1 Hydropower Plant; Replacing 35kV substation equipment that does not ensure operation at An Diem and Ry Ninh hydropower plants; Upgrading and renovating the surface water drainage system at the Central Electricity solar power plant

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 14:46 05/01/2026
Contractor Selection Plan ID
PL2600001048-01
Publishing time
14:44 05/01/2026
Posting Status
Published
Contractor selection plan name
Selecting insurance contractors during the construction of projects: Replacement of governor and excitation systems at A Roang Hydropower Plant; Replacing the speed regulation system and self-powered AC and DC electrical systems at Dray H'Linh B1 Hydropower Plant; Replacing 35kV substation equipment that does not ensure operation at An Diem and Ry Ninh hydropower plants; Upgrading and renovating the surface water drainage system at the Central Electricity solar power plant
Investment objective
Ensuring safe and continuous power supply for generating units to operate reliably and stably, while also serving remote monitoring and control in the near future.
Project management forms
The investor directly manages the project
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500048770-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Other project
Project implementation time
1 Years
Authority that issues the decision
Công ty Dịch vụ Điện lực miền Trung
Approval date
05/01/2026
Approval ID
06/QĐ-CPSC
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 1
1.Package 01/BH-2026: Insurance during construction of projects: Replacement of governor and excitation systems at A Roang Hydropower Plant; Replacing the speed regulation system and self-powered AC and DC electrical systems at Dray H'Linh B1 Hydropower Plant; Replacing 35kV substation equipment that does not ensure operation at An Diem and Ry Ninh hydropower plants; Upgrading and renovating the surface water drainage system at the Central Electricity solar power plant
Tender/ Prequalification Notice ID
Contract execution period
455 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Insurance during construction of projects: Replacement of governor and excitation systems at A Roang Hydropower Plant; Replacing the speed regulation system and self-powered AC and DC electrical systems at Dray H'Linh B1 Hydropower Plant; Replacing 35kV substation equipment that does not ensure operation at An Diem and Ry Ninh hydropower plants; Upgrading and renovating the surface water drainage system at the Central Electricity solar power plant
Capital source details
Capital depreciation
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
January 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Selecting insurance contractors during the construction of projects: Replacement of governor and excitation systems at A Roang Hydropower Plant; Replacing the speed regulation system and self-powered AC and DC electrical systems at Dray H'Linh B1 Hydropower Plant; Replacing 35kV substation equipment that does not ensure operation at An Diem and Ry Ninh hydropower plants; Upgrading and renovating the surface water drainage system at the Central Electricity solar power plant". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Selecting insurance contractors during the construction of projects: Replacement of governor and excitation systems at A Roang Hydropower Plant; Replacing the speed regulation system and self-powered AC and DC electrical systems at Dray H'Linh B1 Hydropower Plant; Replacing 35kV substation equipment that does not ensure operation at An Diem and Ry Ninh hydropower plants; Upgrading and renovating the surface water drainage system at the Central Electricity solar power plant" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 3

You did not use the site, Click here to remain logged. Timeout: 60 second