Set up a loop circuit connecting two roads 473 E21.2 - 473 E21.6 and ensure power supply according to the plan of multi-dividing multiple connections (MDMC) in 2023
Set up a loop circuit connecting two roads 473 E21.2 - 473 E21.6 and ensure power supply according to the plan of multi-dividing multiple connections (MDMC) in 2023
Set up a loop circuit between E21.2 and E21.6 substations through two roads 473 E21.2 and 473 E21.6 to improve power supply stability, flexibility in power supply, distribution load minimizes large-scale power loss in the event of a breakdown or repair.
Meeting the demand for uninterrupted power supply for important loads of Dien Bien Phu City and Dien Bien district. Perform load leveling for E21.2 substation because in the next period the load of this substation will increase.
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info. Our system will help you download files faster, on any device without installing Client Agent. To download, please Login or Register
737.QD-PCDB-27062023- QD phe duyet KHLCNT MD.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!! In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Set up a loop circuit connecting two roads 473 E21.2 - 473 E21.6 and ensure power supply according to the plan of multi-dividing multiple connections (MDMC) in 2023". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Set up a loop circuit connecting two roads 473 E21.2 - 473 E21.6 and ensure power supply according to the plan of multi-dividing multiple connections (MDMC) in 2023" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.