There has been no decision to approve the investment project
Approval date
26/09/2017
List of Bid:
Number of packages: 5
1.Consulting on bidding procedures, consulting on bidding organization to choose Main architectural design consultant, Making investment project, Basic design, Environmental impact assessment, Making fire prevention and fighting plan, Technical design, Construction drawing design, Estimation, Consulting procedures for obtaining construction permits
Borrowed capital and own capital of the enterprise
Contractor Selection Type
Direct contractor, Domestic, No pre-qualification, One stage, one envelope of documents
Contractor Selection Method
Contractor Selection Period
September 2017
Contract Type
All in one
Prequalification
No
Implementation location
2.Bidding consultant selects a consulting unit to verify the main architectural design, investment project preparation, basic design, environmental impact assessment, fire prevention and fighting plan preparation, technical design, construction drawing design Public, Estimating
Borrowed capital and own capital of the enterprise
Contractor Selection Type
Direct contractor, Domestic, No pre-qualification, One stage, one envelope of documents
Contractor Selection Method
Contractor Selection Period
October 2017
Contract Type
All in one
Prequalification
No
Implementation location
3.Main architectural design consultancy, investment project formulation, basic design, environmental impact assessment, fire prevention and fighting plan formulation, technical design, construction drawing design, cost estimation, construction consultancy Continue to apply for a building permit
Borrowed capital and own capital of the enterprise
Contractor Selection Type
Direct contractor, Domestic, No pre-qualification, One stage, one envelope of documents
Contractor Selection Method
Contractor Selection Period
October 2017
Contract Type
All in one
Prequalification
No
Implementation location
4.Consulting and verification for the main package of architectural design, investment project preparation, basic design, environmental impact assessment, fire prevention and fighting plan preparation, technical design, construction drawing design, project preparation maths
Borrowed capital and own capital of the enterprise
Contractor Selection Type
Direct contractor, Domestic, No pre-qualification, One stage, one envelope of documents
Contractor Selection Method
Contractor Selection Period
September 2017
Contract Type
All in one
Prequalification
No
Implementation location
Utilities for you:
Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "SJC Tower". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "SJC Tower" plan as soon as they are posted, sign up for DauThau.info's International VIP 2 plan.