Bidder Selection Plan

stabilizing erosion from an ancient river

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 21:27 21/08/2026
Contractor Selection Plan ID
PL2600272111-00
Publishing time
21:27 21/08/2026
Posting Status
Published
Contractor selection plan name
stabilizing erosion from an ancient river
Procurement name
stabilizing erosion from an ancient river
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Shopping budget
To view full information, please Login or Register
Spending Category
Mandatory spending
Authority that issues the decision
Ủy ban nhân dân xã Quới ĐIền
Approval date
18/08/2026
Approval ID
1095/QĐ-UBND
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 3
1.assessment of landslide risk mitigation measures
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Set up HSMT
Capital source details
The provincial budget includes additional funding specifically allocated to the Quoi Dien commune budget for 2026 (funds for implementing stabilization measures and addressing urgent landslide hazards within the commune).
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
All in One
Implementation location
Xã Quới Điền, Province Vĩnh Long
Prequalification
No
2.slope stabilization/erosion control
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
slope stabilization/erosion control
Capital source details
The provincial budget includes additional funding specifically allocated to the Quoi Dien commune budget for 2026 (funds for implementing stabilization measures and addressing urgent landslide hazards within the commune).
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
All in One
Implementation location
Xã Quới Điền, Province Vĩnh Long
Prequalification
No
3.monitoring landslides
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Monitor
Capital source details
The provincial budget includes additional funding specifically allocated to the Quoi Dien commune budget for 2026 (funds for implementing stabilization measures and addressing urgent landslide hazards within the commune).
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
All in One
Implementation location
Xã Quới Điền, Province Vĩnh Long
Prequalification
No

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "stabilizing erosion from an ancient river". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "stabilizing erosion from an ancient river" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 6

You did not use the site, Click here to remain logged. Timeout: 60 second