Synchronous response to the bridges on the Saigon River to a minimum of 7.0 m according to the inland waterway infrastructure planning period 2021-2030, with a vision to 2050 in Decision No. 1829/QD-TTg dated October 31, 2021 of the Prime Minister;
Facilitating the development of waterway transport infrastructure, developing inland ports of Ho Chi Minh City, Binh Duong Province, Tay Ninh Province; Reduce load for road traffic to ensure traffic safety; Increase regional connection ...
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register
196-qd-25.signed.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices! In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
- Making survey tasks; Proposing the contents and survey volumes to collect the life and load capacity of the existing project (the upper structure, the lower structure), the survey data;
- Designing the design and design step design steps.
2.Tender package No 02: Consulting for bidding documents, evaluating bids of bidding packages: Construction survey consultancy, construction drawing design and cost estimates; Construction investment project management consultancy
- Conditioning bidding documents;
- Criteria for evaluating bids;
- Posting bidding notice;
- Organize bidding invitations, organize contracting conferences;
- Analysis and evaluation of bids and submission of contractor selection results
- Surveying and testing to collect data on life expectancy, quality and load capacity of the existing project (the upper structure, the lower structure), determine the impact when implementing the construction of adjacent works;
- Survey to collect data for design work;
- Make construction drawing designs and estimates.
9.Tender package No 09: Consulting for making bidding documents, evaluating bids of bidding packages: Construction supervision consultancy; Construction and installation of traffic in the construction process; Try to try the bridge load after improving and lifting static; Water supply pipe relocation and reproduction D450
- Conditioning bidding documents;
- Criteria for evaluating bids;
- Posting bidding notice;
- Organize bidding invitations, organize contracting conferences;
- Analysis and evaluation of bids and submission of contractor selection results
- Review and check the contents stated in the traffic safety verification report of previous stages to compare with the results of construction at the scene;
- Proposing additional solutions or adjustments to ensure maximum traffic safety before putting the project into exploitation.
Perform responsibility for compensation for the losses of the work during the construction period arising from all risks, except for the excluding insurance as prescribed.
Monitoring the quality, volume, progress, labor safety and environmental protection during the construction process under the contract with the investor.
- Construction of works that meet the approved exploitation load;
- Ensuring road traffic safety during the construction process;
- Ensuring waterway traffic during the construction process.
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Static lift without Binh Phuoc 1 on Highway 1". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Static lift without Binh Phuoc 1 on Highway 1" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.