Bidder Selection Plan

Steps to design construction drawings and project estimates.

  Watching      
Find: 14:26 19/11/2025
Contractor Selection Plan ID
PL2500190871-01
Publishing time
14:25 19/11/2025
Posting Status
Published
Contractor selection plan name
Steps to design construction drawings and project estimates.
Investment objective
In order to facilitate the connection of the transport network of the University routes.92 –QL.57 and form the inter-communal axis of Quoi Dien Hung-Thanh Phu town, to meet the needs of travel and transport of goods in the region, improve the lives of people, contribute to socio-economic development and complete the new rural infrastructure.
Project management forms
The investor directly manages the project
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500044662-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group C
Project implementation time
3 Years
Authority that issues the decision
Ban Quản lý dự án giao thông tỉnh Vĩnh Long
Approval date
12/11/2025
Approval ID
787/QĐ-BQLGT
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Highest bid price, Approval date, Approval ID, Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 10
1.Package 6: Consulting on making tasks and estimates for surveying, designing construction drawings and estimates
Tender/ Prequalification Notice ID
Contract execution period
10 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Making tasks and estimates for surveying, designing construction drawings and estimates
Capital source details
The state budget in the medium -term public investment plan for the period 2021-2025 and transferred to the medium -term public investment plan for the period 2026 - 2030
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
2.Package 7: Consulting supervision surveys of construction drawing designs and estimates
Tender/ Prequalification Notice ID
Contract execution period
10 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Surveying survey steps for construction drawings and estimates
Capital source details
The state budget in the medium -term public investment plan for the period 2021-2025 and transferred to the medium -term public investment plan for the period 2026 - 2030
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
3.Package 8: Survey consultancy, design design Construction drawings and estimates
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Survey, Design construction drawings and cost estimates
Capital source details
The state budget in the medium -term public investment plan for the period 2021-2025 and transferred to the medium -term public investment plan for the period 2026 - 2030
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
4.Bidding package 9: Consulting on examining construction drawing and estimates
Tender/ Prequalification Notice ID
Contract execution period
15 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Verification of construction drawing design and cost estimate
Capital source details
The state budget in the medium -term public investment plan for the period 2021-2025 and transferred to the medium -term public investment plan for the period 2026 - 2030
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
5.Bidding package No. 10: Consulting on preparation of bidding documents, evaluation of bidding documents for construction packages
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on setting up bidding documents, evaluating bids for construction bidding packages
Capital source details
State budget in the medium-term public investment plan for the period 2021-2025 and transition to the medium-term public investment plan for the period 2026 - 2030
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
6.Bidding package No. 11: Consulting on appraisal of bidding documents, appraisal of QLCNT results for construction bidding packages
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on appraisal of Bidding Documents, Evaluation of construction results of construction bidding package
Capital source details
State budget in the medium-term public investment plan for the period 2021-2025 and transition to the medium-term public investment plan for the period 2026 - 2030
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
7.Tender package No 12: Construction
Tender/ Prequalification Notice ID
Contract execution period
360 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of works according to the approved design documents and construction contracts
Capital source details
State budget in the medium-term public investment plan for the period 2021-2025 and transition to the medium-term public investment plan for the period 2026 - 2030
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
8.Package 13: Construction supervision
Tender/ Prequalification Notice ID
Contract execution period
360 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction supervision
Capital source details
State budget in the medium-term public investment plan for the period 2021-2025 and transition to the medium-term public investment plan for the period 2026 - 2030
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
9.Package 14: Construction insurance
Tender/ Prequalification Notice ID
Contract execution period
360 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction insurance during the construction time
Capital source details
State budget in the medium-term public investment plan for the period 2021-2025 and transition to the medium-term public investment plan for the period 2026 - 2030
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
10.Tender package No 15: Inspection of construction acceptance work
Tender/ Prequalification Notice ID
Contract execution period
390 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Make a task outline, estimate and check the work of construction and construction acceptance
Capital source details
State budget in the medium-term public investment plan for the period 2021-2025 and transition to the medium-term public investment plan for the period 2026 - 2030
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Steps to design construction drawings and project estimates.". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Steps to design construction drawings and project estimates." plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 5

You did not use the site, Click here to remain logged. Timeout: 60 second