Supervising and verifying contents, methods and results of water quality monitoring and forecasting tasks; forecast water sources and develop a water use plan to serve the direction and administration of water supply for agricultural production in 2022
Supervising and verifying contents, methods and results of water quality monitoring and forecasting tasks; forecast water sources and develop a water use plan to serve the direction and administration of water supply for agricultural production in 2022
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info. Our system will help you download files faster, on any device without installing Client Agent. To download, please Login or Register
QD KHLCNT Nhiem vu Giam sat nam 2022.pdf
List of Bid:
Number of packages: 6
1.Package 1: Supervising and verifying the content, methods and results of the tasks of forecasting water sources and developing water use plans in the river basins of the Northern region
Short appointment of contractors, no pre-qualification domestically, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2022
Contract Type
All in one
Prequalification
No
Location
3.Package 3: Supervising and verifying the contents, methods and results of performing the task of forecasting water sources and developing water use plans in river basins in the Central Highlands
Short appointment of contractors, no pre-qualification domestically, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2022
Contract Type
All in one
Prequalification
No
Location
4.Package 4: Supervising and verifying the contents, methods and results of performing the tasks of forecasting water sources and developing water use plans in river basins in the Central region
Short appointment of contractors, no pre-qualification domestically, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2022
Contract Type
All in one
Prequalification
No
Location
5.Package 5: Supervising and verifying the contents, methods and results of the task of forecasting water sources and formulating water use plans in river basins in the Southeast region; monitoring water quality Dau Tieng Irrigation System
Short appointment of contractors, no pre-qualification domestically, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2022
Contract Type
All in one
Prequalification
No
Location
6.Package 6: Monitoring and verifying the contents, methods and results of the tasks of forecasting water sources and developing plans for water use in the dry and flood seasons, monitoring the water quality and other tasks. related services in the Mekong Delta region
Short appointment of contractors, no pre-qualification domestically, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2022
Contract Type
All in one
Prequalification
No
Location
Utilities for you:
Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Supervising and verifying contents, methods and results of water quality monitoring and forecasting tasks; forecast water sources and develop a water use plan to serve the direction and administration of water supply for agricultural production in 2022". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Supervising and verifying contents, methods and results of water quality monitoring and forecasting tasks; forecast water sources and develop a water use plan to serve the direction and administration of water supply for agricultural production in 2022" plan as soon as they are posted, sign up for DauThau.info's International VIP 2 plan.