The contractor selection plan is included in the feasibility report for the construction of rural roads: Village 4 - Village 5 Road, Tam Bo Commune; the road to the large production area from Dinh Lac commune to Gia Hiep commune; village road 17, Hoa Bac commune to Hoa Ninh commune and build La An bridge on Dinh Trang Hoa - Hoa Trung - Hoa Bac route
The contractor selection plan is included in the feasibility report for the construction of rural roads: Village 4 - Village 5 Road, Tam Bo Commune; the road to the large production area from Dinh Lac commune to Gia Hiep commune; village road 17, Hoa Bac commune to Hoa Ninh commune and build La An bridge on Dinh Trang Hoa - Hoa Trung - Hoa Bac route
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info. Our system will help you download files faster, on any device without installing Client Agent. To download, please Login or Register
QD 943 phe duyet KHDT duong thon 4 5 thon 17 cau La On Di Linh.pdf
List of Bid:
Number of packages: 6
1.Supervising and surveying the design and construction drawing steps
Appointment of short-term, domestic contractors, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2021
Contract Type
All in one
Prequalification
No
Location
4.Construction of the road from village 4 to village 5, Tam Bo commune and the road to the large production area from Dinh Lac commune to Gia Hiep commune
Bidding widely, domestically, without prequalification, online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2021
Contract Type
All in one
Prequalification
No
Location
5.Construction of road construction of village 17, Hoa Bac commune to Hoa Ninh commune and construction of La An bridge on Dinh Trang Hoa - Hoa Trung - Hoa Bac route
Self-implementation, domestic, no pre-qualification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2021
Contract Type
By the time
Prequalification
No
Location
Utilities for you:
Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "The contractor selection plan is included in the feasibility report for the construction of rural roads: Village 4 - Village 5 Road, Tam Bo Commune; the road to the large production area from Dinh Lac commune to Gia Hiep commune; village road 17, Hoa Bac commune to Hoa Ninh commune and build La An bridge on Dinh Trang Hoa - Hoa Trung - Hoa Bac route". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "The contractor selection plan is included in the feasibility report for the construction of rural roads: Village 4 - Village 5 Road, Tam Bo Commune; the road to the large production area from Dinh Lac commune to Gia Hiep commune; village road 17, Hoa Bac commune to Hoa Ninh commune and build La An bridge on Dinh Trang Hoa - Hoa Trung - Hoa Bac route" plan as soon as they are posted, sign up for DauThau.info's International VIP 2 plan.