Bidder Selection Plan

Tissue culture banana planting using high technology of Phu Rieng Rubber Company Limited (Phase 6)

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 08:24 14/01/2026
Contractor Selection Plan ID
PL2600008745-00
Publishing time
08:22 14/01/2026
Posting Status
Published
Contractor selection plan name
Tissue culture banana planting using high technology of Phu Rieng Rubber Company Limited (Phase 6)
Name of project
Tissue culture banana planting using high technology of Phu Rieng Rubber Company Limited (Phase 6)
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Total investment
To view full information, please Login or Register
Spending Category
Other
Authority that issues the decision
CÔNG TY TNHH MỘT THÀNH VIÊN CAO SU PHÚ RIỀNG
Approval date
05/01/2026
Approval ID
01/QĐ-HĐTVCSPR
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 5
1.Construction and equipment for tissue culture banana planting using high technology of Phu Rieng Rubber Company Limited. Item: Pipeline, pump reservoir, floating pump station and manifold to transmission pipe connection point. Symbol XL04
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction and equipment for tissue culture banana planting using high technology of Phu Rieng Rubber Company Limited. Item: Pipeline, pump reservoir, floating pump station and manifold to transmission pipe connection point. Symbol XL04
Capital source details
Equity (30%); Loans and other mobilized capital sources (70%)
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
2.Construction and equipment for tissue culture banana planting using high technology of Phu Rieng Rubber Company Limited. Item: Level 2 pumping station belonging to reservoirs No. 2 and No. 3; Water transmission pipeline from reservoir No. 1 to reservoir No. 2 and from reservoir No. 2 to reservoir No. 3. Symbol XL05
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction and equipment for tissue culture banana planting using high technology of Phu Rieng Rubber Company Limited. Item: Level 2 pumping station belonging to reservoirs No. 2 and No. 3; Water transmission pipeline from reservoir No. 1 to reservoir No. 2 and from reservoir No. 2 to reservoir No. 3. Symbol XL05
Capital source details
Equity (30%); Loans and other mobilized capital sources (70%)
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
3.Construction and equipment for tissue culture banana planting using high technology of Phu Rieng Rubber Company Limited. Category: Automatic irrigation system for 300 hectares of bananas. Symbol XL06
Tender/ Prequalification Notice ID
Contract execution period
300 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction and equipment for tissue culture banana planting using high technology of Phu Rieng Rubber Company Limited. Category: Automatic irrigation system for 300 hectares of bananas. Symbol XL06
Capital source details
Equity (30%); Loans and other mobilized capital sources (70%)
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
4.Prepare bidding documents, evaluate bidding documents for items: pipelines, pump reservoirs, floating pump stations and manifold pipes to the transmission pipe connection point. Symbol XL04, Item: Level 2 pumping station in reservoirs No. 2 and No. 3; Water transmission pipeline from reservoir No. 1 to reservoir No. 2 and from reservoir No. 2 to reservoir No. 3. Symbol XL05 and Item: Automatic irrigation system for 300 hectares of bananas. Symbol XL06
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare bidding documents, evaluate bidding documents for items: pipelines, pump reservoirs, floating pump stations and manifold pipes to the transmission pipe connection point. Symbol XL04, Item: Level 2 pumping station in reservoirs No. 2 and No. 3; Water transmission pipeline from reservoir No. 1 to reservoir No. 2 and from reservoir No. 2 to reservoir No. 3. Symbol XL05 and Item: Automatic irrigation system for 300 hectares of bananas. Symbol XL06
Capital source details
Equity (30%); Loans and other mobilized capital sources (70%)
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
5.Evaluate bidding documents; Appraisal of contractor selection results for items: Pipelines, pump reservoirs, floating pump stations and manifold pipes to the transmission pipe connection point. Symbol XL04, Item: Level 2 pumping station in reservoirs No. 2 and No. 3; Water transmission pipeline from reservoir No. 1 to reservoir No. 2 and from reservoir No. 2 to reservoir No. 3. Symbol XL05 and Item: Automatic irrigation system for 300 hectares of bananas. Symbol XL06
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Evaluate bidding documents; Appraisal of contractor selection results for items: Pipelines, pump reservoirs, floating pump stations and manifold pipes to the transmission pipe connection point. Symbol XL04, Item: Level 2 pumping station in reservoirs No. 2 and No. 3; Water transmission pipeline from reservoir No. 1 to reservoir No. 2 and from reservoir No. 2 to reservoir No. 3. Symbol XL05 and Item: Automatic irrigation system for 300 hectares of bananas. Symbol XL06
Capital source details
Equity (30%); Loans and other mobilized capital sources (70%)
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Tissue culture banana planting using high technology of Phu Rieng Rubber Company Limited (Phase 6)". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Tissue culture banana planting using high technology of Phu Rieng Rubber Company Limited (Phase 6)" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 0

You did not use the site, Click here to remain logged. Timeout: 60 second